Cisco ONS 15454 Hardware Installation Manual page 393

Hide thumbs Also See for ONS 15454:
Table of Contents

Advertisement

Installing the ONS 15454 M6 Shelf
Figure 250: Installing a Power Filler Module
Step 4
Return to your originating procedure (NTP).
Note
DLP-G737 Replacing 15454-M6-DC With 15454-M6-DC20 Power Module
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
When the ONS 15454 M6 shelf is powered at –60 VDC (nominal), only the TNC, OPT-AMP-C,
OPT-AMP-17-C, OPT-EDFA-17, and OPT-EDFA-24 cards, and the 15454-M6-ECU-60 can be
installed.
This procedure replaces the 15454-M6-DC with 15454-M6-DC20 power module.
#2 Phillips Dynamometric screwdriver
NTP-G259 Open and Remove the Standard Door of the ONS 15454 M6 Shelf ,
on page
327.
Required
Onsite
None
DLP-G737 Replacing 15454-M6-DC With 15454-M6-DC20 Power Module
Cisco ONS 15454 Hardware Installation Guide
363

Advertisement

Table of Contents
loading

Table of Contents