Configuration - Cisco ONS 15454 Hardware Installation Manual

Hide thumbs Also See for ONS 15454:
Table of Contents

Advertisement

Installing the ONS 15454 M2 Shelf
DLP-G582 Mounting the 19-inch Brackets on the ONS 15454 M2 Shelf for ANSI Rack Configuration
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Caution
Use only the fastening hardware provided with the ONS 15454 M2 to prevent loosening, deterioration, and
electromechanical corrosion of the hardware and joined material.
Caution
When mounting the ONS 15454 M2 in a frame with a nonconductive coating (such as paint, lacquer, or
enamel) either use the thread-forming screws provided with the ONS 15454 M2 ship kit, or remove the coating
from the threads to ensure electrical continuity.
Note
The mounting brackets can be installed in the front or the middle position of the chassis.
Procedure
Step 1
Place the wider side of the 19-inch mounting bracket flush against the shelf (see the following figure). The
narrow side of the mounting bracket should be towards the front of the shelf.
Step 2
Align the mounting bracket screw holes against the shelf screw holes.
Step 3
Insert the screws and tighten them to a torque value of 11.5 in-lb (1.3 N-m).
Step 4
Repeat steps 1 through 3 for the mounting bracket on the opposite side.
DLP-G582 Mounting the 19-inch Brackets on the ONS 15454 M2 Shelf for ANSI Rack Configuration
This task installs the 19-inch mounting brackets to the ONS 15454 M2 shelf for
ANSI rack configuration.
• #2 Phillips Dynamometric screwdriver
• Medium slot-head screwdriver
• Small slot-head screwdriver
NTP-G305 Unpack and Inspect the ONS 15454, ONS 15454 M2, and ONS 15454
M6 Shelves, on page
20.
As needed
Onsite
None
Cisco ONS 15454 Hardware Installation Guide
197

Advertisement

Table of Contents
loading

Table of Contents