Cisco ONS 15454 Hardware Installation Manual page 427

Hide thumbs Also See for ONS 15454:
Table of Contents

Advertisement

Installing the ONS 15454 M6 Shelf
Figure 269: Sequence to Remove the Power Module
Step 5
Return to your originating procedure (NTP).
NTP-G312 Attach Wires to Alarm, Timing, LAN, and Craft Pin
Connections in Cisco ONS 15454 M6
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
NTP-G312 Attach Wires to Alarm, Timing, LAN, and Craft Pin Connections in Cisco ONS 15454 M6
Use this procedure to attach alarm, timing, LAN, and craft wires in the ONS 15454
M6 shelf.
Twisted #22 or #24 AWG (0.51 mm² or 0.64 mm²) shielded wires for LAN or
craft 75-ohm coaxial cable with DIN-1.0/2.3 miniature coaxial connector, Alarm
26 pins SCSI cable. The PIDs of the SCSI cables are listed in
SCSI Cables, on page
398.
NTP-G253 Install the ECU or ECU-S Module, on page 349
As needed
Cisco ONS 15454 Hardware Installation Guide
Table 35: PIDs for
397

Advertisement

Table of Contents
loading

Table of Contents