Installing the ONS 15454 M6 Shelf
Step 3
Complete the necessary rack mounting task as applicable:
Step 4
Connect the chassis to the office ground. For detailed instructions on how to ground the chassis, see the
Electrostatic Discharge and Grounding Guide for Cisco CPT and Cisco ONS Platforms
Step 5
Continue with
Stop. You have completed this procedure.
DLP-G674 Verify the ONS 15454 M6 Shelf for AC Power Module Installation
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Procedure
Step 1
Verify the position of the mechanical locking system on the rear side of the chassis. To use the AC power
module, the screw must be close to the AC silk-screen text (see the following figure).
DLP-G561 Mounting the Bracket with Air Deflectors (Front-to-Back) on the ONS 15454 M6 Shelf for
ANSI Rack Configuration, on page 302
DLP-G562 Mounting the Brackets on the ONS 15454 M6 Shelf for ETSI Rack Configuration, on page
304
DLP-G563 Mounting the Air Deflectors (Front-to-Front) on the ONS 15454 M6 Shelf for ETSI Rack
Configuration, on page 306
DLP-G564 Mounting the Bracket with Air Deflectors (Front-to-Back) on the ONS 15454 M6 Shelf for
ETSI Rack Configuration, on page 307
DLP-G565 Mounting the Bracket with Air Deflectors (Front-to-Top) on the ONS 15454 M6 Shelf for
ETSI Rack Configuration, on page 309
DLP-G821 Mounting the Bracket with Air Deflectors (Front-to-Side) on the ONS 15454 M6 Shelf for
ETSI Rack Configuration, on page 313
DLP-G566 Mount the ONS 15454 M6 Shelf on a Rack (One Person) , on page
DLP-G567 Mount the ONS 15454 M6 Shelf on a Rack (Two People) , on page
DLP-G568 Mount Multiple ONS 15454 M6 Shelves on a Rack , on page
NTP-G259 Open and Remove the Standard Door of the ONS 15454 M6 Shelf , on page
This task verifies the shelf for AC power module installation.
None
NTP-G305 Unpack and Inspect the ONS 15454, ONS 15454 M2, and ONS 15454
M6 Shelves, on page 20
Required
Onsite
None
DLP-G674 Verify the ONS 15454 M6 Shelf for AC Power Module Installation
Cisco ONS 15454 Hardware Installation Guide
315.
317.
318.
.
327.
297

Advertisement

Table of Contents
loading

Table of Contents