Cisco ONS 15454 Hardware Installation Manual page 179

Hide thumbs Also See for ONS 15454:
Table of Contents

Advertisement

Installing the ONS 15454 M12 (ANSI and ETSI) Shelf
Security Level
Procedure
Step 1
Disconnect the ONS 15454 subtending shelf from the EAPs:
a) Remove the cross-over (CAT 5) LAN cable (connecting the ONS 15454 subtending shelf) from the SSC8
port of the right EAP.
b) Remove the cross-over (CAT 5) LAN cable (connecting the ONS 15454 subtending shelf) from the SSC8
port of the left EAP.
Step 2
Connect the EAPs to the Catalyst 3560:
a) Using a cross-over (CAT-5) LAN cable:
b) Using a cross-over (CAT-5) LAN cable:
Step 3
Reconnect the ONS 15454 subtending shelf disconnected in Step 1 to the Catalyst 3560 switches:
a) Using a cross-over (CAT-5) LAN cable:
b) Using a cross-over (CAT-5) LAN cable:
Step 4
Repeat Step 3a and 3b to connect the additional ONS 15454 subtending shelves in the multishelf configuration
from Port 3 through Port 24 on the Catalyst 3560 switches.
Step 5
To configure the Catalyst 3560 in case of upgrade, complete the
or Catalyst 3560 (Active and Standby) for a ONS 15454 Multishelf Node, on page
NTP-G296 Upgrade the ONS 15454 Multishelf with MS-ISC Card Configuration Using the Catalyst 3560
None
• Plug one connector to the SSC8 port of the right EAP.
• Plug the other connector to Port 1 of the active Catalyst 3560.
• Plug one connector to the SSC8 port of the left EAP.
• Plug the other connector to Port 1 of the standby Catalyst 3560.
• Plug one connector into the front panel of the subtending shelf TCC2/TCC2P/TCC3 card in
Slot 7.
• Plug the other connector into Port 2 of the active Catalyst 3560.
• Plug one connector into the front panel of the subtending shelf TCC2/TCC2P/TCC3 card in
Slot 11.
• Plug the other connector into Port 2 of the standby Catalyst 3560.
NTP-G298 Configure a Cisco Catalyst 2950
Cisco ONS 15454 Hardware Installation Guide
152.
149

Advertisement

Table of Contents
loading

Table of Contents