Installing the ONS 15454 M12 (ANSI and ETSI) Shelf
Step 6
Enter the following interface commands:
Example:
(Router(config)#
(Router(config)#
(Router(config)#
(Router(config)#
(Router(config)#
(Router(config)#
(Router(config)#
(Router(config)#
(Router(config)#
(Router(config)#
(Router(config)#
(Router(config)#
Stop. You have completed this procedure.
NTP-G307 Perform the ONS 15454 Shelf Installation Acceptance
Test
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Procedure
Step 1
If you installed an ONS 15454 ETSI shelf, complete the following table by verifying that each applicable
procedure was completed.
Table 24: ONS 15454 ETSI Shelf Installation Task Summary
Description
NTP-G305 Unpack and Inspect the ONS 15454, ONS 15454 M2, and ONS 15454 M6 Shelves,
on page 20
interface POS0
no ip address
no ip route-cache
shutdown
crc 32
interface POS1
no ip address
no ip route-cache
shutdown
crc 32
ip classless
no ip http server
Use this procedure to perform a shelf installation acceptance test for the ONS
15454 ETSI or ONS 15454 ANSI.
Voltmeter
Applicable procedures in
on page 23
Required
Onsite
None
NTP-G307 Perform the ONS 15454 Shelf Installation Acceptance Test
Installing the ONS 15454 M12 (ANSI and ETSI) Shelf,
Cisco ONS 15454 Hardware Installation Guide
Completed
143