NTP-G297 Upgrade the ONS 15454 Multishelf with Catalyst 2950 Configuration Using the Catalyst 3560
Figure 67: Upgrade the ONS 15454 Multishelf with MS-ISC Card Configuration Using the Catalyst 3560
NTP-G297 Upgrade the ONS 15454 Multishelf with Catalyst 2950
Configuration Using the Catalyst 3560
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Cisco ONS 15454 Hardware Installation Guide
150
Use this procedure to upgrade the existing ONS 15454 multishelf configuration
that uses the Catalyst 2950 with the Catalyst 3560
• Two Cisco Catalyst 3560 switches must be installed in same rack as the node
controller shelf; refer to the Cisco Catalyst 3560 product documentation for
installation instructions.
• Cross-over (CAT-5) LAN cables (3, plus 2 for each subtending shelf)
NTP-G15 Install the Common Control Cards, on page
As needed
Onsite
None
Installing the ONS 15454 M12 (ANSI and ETSI) Shelf