Dlp-G32 Install The Y-Cable Protection Modules In The Flexlayer Shelf - Cisco ONS 15454 Hardware Installation Manual

Hide thumbs Also See for ONS 15454:
Table of Contents

Advertisement

Installing the ONS 15454 M12 (ANSI and ETSI) Shelf
Part Number
15216-FLB-2-58.9=
15216-FLB-2-60.6=
Step 2
Insert the appropriate module into the FlexLayer shelf.
Step 3
Use a Phillips Dynamometric screwdriver to install the two accompanying screws.
The following figure shows the FlexLayer shelf and how the FlexLayer modules can be installed.
Figure 63: ONS 15xxx FlexLayer Shelf
Step 4
Repeat this task as necessary for each FlexLayer module you want to install.
Step 5
Return to your originating procedure (NTP).

DLP-G32 Install the Y-Cable Protection Modules in the FlexLayer Shelf

Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
DLP-G32 Install the Y-Cable Protection Modules in the FlexLayer Shelf
Description
ITU-100 GHz 2 Ch, FlexMod - 1558.17 and 1558.98
ITU-100 GHz 2 Ch, FlexMod - 1559.79 and 1560.61
This task installs the Y-cable protection modules in the FlexLayer shelf.
#2 Phillips Dynamometric screwdriver
Y-cable module(s): Multi-Mode Y-Cable Protection FlexModule(s)
(15216-CS-MM-Y) or Single-Mode Y-Cable Protection FlexModule(s)
(15216-CS-SM-Y), as appropriate
None
As needed
Onsite
None
Cisco ONS 15454 Hardware Installation Guide
129

Advertisement

Table of Contents
loading

Table of Contents