Cisco ONS 15454 Hardware Installation Manual page 177

Hide thumbs Also See for ONS 15454:
Table of Contents

Advertisement

Installing the ONS 15454 M12 (ANSI and ETSI) Shelf
Required/As Needed
Onsite/Remote
Security Level
Note
This procedure explains the steps to connect the ONS 15454 multishelf node and subtending shelves to a
24-port Catalyst 2950 or Catalyst 3560 switch. Follow the steps provided in this procedure to connect the
multishelf node to the 48-port Catalyst 2950 or Catalyst 3560 switch.
Procedure
Step 1
Using a cross-over (CAT-5) LAN cable:
a) Plug one connector into Port 1 of the active Catalyst 2950 or Catalyst 3560.
b) Plug the other connector into the front panel of the node controller TCC2/TCC2P/TCC3 card in Slot 7.
Step 2
Using a cross-over (CAT-5) LAN cable:
a) Plug one connector into Port 1 of the standby Catalyst 2950 or Catalyst 3560.
b) Plug the other end into the front panel of the node controller TCC2/TCC2P/TCC3 card in Slot 11.
Step 3
Using a cross-over (CAT-5) LAN cable:
a) Plug one connector into Port 22 of the active Catalyst 2950 or Catalyst 3560.
b) Plug the other connector into Port 22 of the standby Catalyst 2950 or Catalyst 3560.
Step 4
To connect a subtending shelf to the Catalyst 2950 or Catalyst 3560 switches, complete the following:
a) Using a cross-over (CAT-5) LAN cable:
b) Using a cross-over (CAT-5) LAN cable:
c) Repeat Steps a and b to connect the additional ONS 15454 subtending shelves in the multishelf configuration
using Ports 3 through Port 21 on the Catalyst 2950 or Catalyst 3560 switches.
Note
Step 5
To configure the active and standby Catalyst 2950 or Catalyst 3560, complete the
Cisco Catalyst 2950 or Catalyst 3560 (Active and Standby) for a ONS 15454 Multishelf Node, on page
The following figure shows the ONS 15454 multishelf and subtending shelves connected to the Catalyst 2950
or Catalyst 3560.
NTP-G295 Connect the ONS 15454 Multishelf Node and Subtending Shelves to a Catalyst 2950 or Catalyst 3560
As needed
Onsite
None
• Plug one connector into the front panel of the subtending shelf TCC2/TCC2P/TCC3 card in
Slot 7.
• Plug the other end into Port 2 of the active Catalyst 2950 or Catalyst 3560.
• Plug one connector into the front panel of the subtending shelf TCC2/TCC2P/TCC3 card in
Slot 11.
• Plug the other end into Port 2 of the standby Catalyst 2950 or Catalyst 3560.
If the number of subtending shelves exceed 12, it's recommended to use the TCC3 cards.
NTP-G298 Configure a
Cisco ONS 15454 Hardware Installation Guide
152.
147

Advertisement

Table of Contents
loading

Table of Contents