Preparing to Install the ONS 15454 (ANSI and ETSI), ONS 15454 M2 and ONS 15454 M6 Shelf
Required Tools and Equipment
The following sections describe the tools and equipment you need to install and test the ONS 15454 (ANSI
and ETSI), ONS 15454 M2 or the ONS 15454 M6 shelves.
Cisco Supplied Materials
The following table lists the materials that are required to install, and are shipped with the ONS 15454 (ANSI
and ETSI), ONS 15454 M2 and the ONS 15454 M6 shelves (wrapped in plastic). The shipped quantity of
each item is in parentheses.
Note
To avoid damage during shipment, either a standard front door or a temporary front door is preinstalled in
the Cisco ONS 15454 M6 shelf. If a front door is ordered, a standard front door is preinstalled. If a front door
is not ordered, a temporary front door is preinstalled.
Table 1: Cisco Supplied Materials Required to Install
Cisco Supplied
ONS 15454
Material
Backplane Cover
ANSI
Sheet metal backplane cover (installed)
(1)
Brackets
ANSI
External (bottom) brackets for the fan-tray
air filter
ETSI
Bottom brackets for the fan-tray air filter
Bracket Cover
Bumpers
Cables
ETSI
• Cable assembly, Ethernet, RJ-45 (1)
• Power cable (from fuse and alarm
panel to MIC-A/P and MIC-C/T/P)
(2)
Emery Cloth
ONS 15454 M2
ANSI
RJ LAN bracket (1)
ANSI
RJ LAN cable bracket cover (1)
Rubber bumpers (4)
Cable assembly, Ethernet, RJ-45
(1)
Emery cloth (1)
Cisco ONS 15454 Hardware Installation Guide
Required Tools and Equipment
ONS 15454 M6
ANSI
RJ LAN bracket (1)
ANSI
RJ LAN cable bracket cover (1)
Cable assembly, Ethernet,
RJ-45 (1)
Emery cloth (1)
9