Cisco ONS 15454 Hardware Installation Manual page 164

Hide thumbs Also See for ONS 15454:
Table of Contents

Advertisement

DLP-G33 Install the TCC2, TCC2P, or TCC3 Card
• Both green PWR LEDs turn on for 10 seconds. The PWR LEDs then turn red for 2 to 3 minutes
• The boot-up process is complete when the PWR LEDs turn green and the yellow ACT/STBY remains
Note
Note
Note
Note
c) For the TCC3 card:
• All LEDs turn on briefly. The red FAIL LED, the yellow ACT/STBY LED, the green SYNC LED,
• The red FAIL LED and the green ACT/STBY LED turn on for about 15 seconds.
• The red FAIL LED blinks for about 3 seconds.
• The red FAIL LED turns on for about 60 seconds.
• The red FAIL LED blinks for about 15 seconds and then becomes solid (the LED is turned on for
• All LEDs (including the CRIT, MAJ, MIN, REM, SYNC, and ACO LEDs) blink once and turn off
• Both green PWR LEDs turn on for 10 seconds. The PWR LEDs then turn red for 2 to 3 minutes
• The boot-up process is complete when the PWR LEDs turn green and the yellow ACT/STBY remains
Note
Note
Note
Note
Step 5
Verify that the ACT/STBY LED is green if this is the first powered-up TCC2/TCC2P/TCC3 card installed,
or yellow for standby if this is the second powered-up TCC2/TCC2P/TCC3. The IP address, temperature of
the node, and time of day appear on the LCD. The default time and date is 12:00 AM, January 1, 1970.
Step 6
The LCD cycles through the IP address (the default is 192.1.0.2), node name, and software version. Verify
that the correct software version is shown on the LCD. The software text string indicates the node type (SDH
or SONET) and software release. (For example: SDH 09.20-05L-20.10 indicates it is an SDH software load,
Release 9.2. The numbers following the release number do not have any significance.)
Cisco ONS 15454 Hardware Installation Guide
134
before going to steady green. During this time, the ACT/STBY, MJ, and MN LEDs might turn on,
followed by the SNYC LED briefly.
on. (The ACT/STBY LED will be green if this is the first TCC2P card installed, and yellow if this
is the second TCC2P card installed.)
It might take up to three minutes for the A and B power alarms to clear.
Alarm LEDs might be on; disregard alarm LEDs until you are logged into CTC and can view
the Alarms tab.
If you are logged into CTC, the SFTWDOWN alarm might appear as many as two times while
the TCC2P card initializes. The alarm should clear after the card completely boots.
If the FAIL LED is on continuously, see the tip in Step 8 about the TCC2P card automatic
upload.
and the green ACO LED turn on for about 25 seconds.
about 20 seconds).
for about 5 seconds.
before going to steady green. During this time, the ACT/STBY, MJ, and MN LEDs might turn on,
followed by the SNYC LED briefly.
on. (The ACT/STBY LED will be green if this is the first TCC3 card installed, and yellow if this is
the second TCC3 card installed.)
It might take up to three minutes for the A and B power alarms to clear.
Alarm LEDs might be on; disregard alarm LEDs until you are logged into CTC and can view
the Alarms tab.
If you are logged into CTC, the SFTWDOWN alarm might appear as many as two times while
the TCC3 card initializes. The alarm should clear after the card completely boots.
If the FAIL LED is on continuously, see the tip in Step 8 about the TCC3 card automatic upload.
Installing the ONS 15454 M12 (ANSI and ETSI) Shelf

Advertisement

Table of Contents
loading

Table of Contents