Dlp-G601 Inspect The Ons 15454 M2 Shelf Installation And Connections; Dlp-G602 Measure Dc Voltage On The Ons 15454 M2 Shelf - Cisco ONS 15454 Hardware Installation Manual

Hide thumbs Also See for ONS 15454:
Table of Contents

Advertisement

DLP-G601 Inspect the ONS 15454 M2 Shelf Installation and Connections

Description
DLP-G604 Install the TNC, TNCE, TSC, or TSCE Card, on page 262
NTP-G269 Install the Standard Door of the ONS 15454 M2 Shelf, on page 216
Step 2
Complete the
Step 3
Complete the
Step 4
Continue with
Stop. You have completed this procedure.
DLP-G601 Inspect the ONS 15454 M2 Shelf Installation and Connections
Purpose
Tools/Equipment
Prerequisite
Procedures
Required/As Needed
Onsite/Remote
Security Level
Procedure
Step 1
Make sure all external wiring connections (that is, power, ground, alarms, and so on) are secure. If a wire or
cable is loose, return to the appropriate procedure in this chapter to correct it.
Step 2
Return to your originating procedure (NTP).

DLP-G602 Measure DC Voltage on the ONS 15454 M2 Shelf

Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Cisco ONS 15454 Hardware Installation Guide
268
DLP-G601 Inspect the ONS 15454 M2 Shelf Installation and Connections , on page
DLP-G602 Measure DC Voltage on the ONS 15454 M2 Shelf, on page
Connect the PC and Log into the GUI
Use this task to inspect the shelf installation and connections and verify that
everything is installed and connected properly.
None
None
Required
Onsite
None
Use this task to measure the power to verify correct power and returns.
Voltmeter
Before installing the DC power, check the voltage
Required
Onsite
None
Installing the ONS 15454 M2 Shelf
Completed
268.
268.

Advertisement

Table of Contents
loading

Table of Contents