DLP-G19 Turn On and Verify Office Power

Step 9
If you use redundant power leads, terminate the return 2 lead to the positive RET2 terminal on the ONS 15454.
Terminate the negative 2 lead to the negative BAT2 terminal on the ONS 15454. Use oxidation-preventative
grease to keep connections noncorrosive.
Note
Step 10
Route the cables out below the power terminals using the plastic cable clamp, as shown in
ONS 15454 Power Terminals, on page
Step 11
Connect the return cables to earth ground at power supply side.
Step 12
Return to your originating procedure (NTP).
DLP-G19 Turn On and Verify Office Power
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Caution
Do not apply power to the shelf until you complete all installation steps.
Procedure
Step 1
Using a voltmeter, verify the office battery and ground at the following points on the fuse and alarm panel:
a) To verify the power, place the black test lead of the voltmeter to the frame ground. Place the red test lead
on the A-side connection and verify that it is between –40.5 VDC and –57 VDC. Place the red test lead
on the B-side connection and verify that it is between –40.5 VDC and –57 VDC.
Cisco ONS 15454 Hardware Installation Guide
74
The configured ONS 15454 shelf can work with a single power line since the ONS 15454 power
configuration offers redundancy. When using the 15454-FTA3 fan-tray, if the ONS15454 shelf is
powered by a single power line, the BAT-FAIL alarm appears, the fans run at a maximum speed,
and the system does not comply with NEBS GR-63 Issue 3 and GR-1089 Issue 4 and 5 requirements.
In order to meet the above mentioned NEBS requirements, the ONS 15454 shelf must be powered
by both the DC power lines.
This task measures the power to verify correct power and returns for the ONS
15454 shelf.
Voltmeter
ETSI:
• Connect the office ground to chassis. For detailed instructions on grounding,
refer to the
Cisco ONS
DLP-G17 Connect Office Power to the ONS 15454 ETSI , on page 70
DLP-G18 Connect Office Power to the ONS 15454 ANSI, on page 71
Required
Onsite
None
Installing the ONS 15454 M12 (ANSI and ETSI) Shelf
73.
Electrostatic Discharge and Grounding Guide for Cisco CPT and
Platforms.
Figure 40: Cisco

Advertisement

Table of Contents
loading

Table of Contents