Installing the ONS 15454 M6 Shelf
Description
NTP-G258 Install the Standard Door of the ONS 15454 M6 Shelf , on page 323
Note
Step 2
Complete the
Step 3
Complete the
Step 4
Continue with the
Stop. You have completed this procedure.
DLP-G578 Inspect the ONS 15454 M6 Shelf Installation and Connections
Purpose
Tools/Equipment
Prerequisite
Procedures
Required/As Needed
Onsite/Remote
Security Level
Procedure
Step 1
Make sure all external wiring connections on the ECU module (that is, power, ground, alarms, and so on) are
secure. If a wire or cable is loose, return to the appropriate procedure in this chapter to correct it.
Step 2
Return to your originating procedure (NTP).
DLP-G579 Measure DC Voltage on the ONS 15454 M6 Shelf
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
The ECU module, power modules, LCD and the fan-tray assembly can be installed in any order.
DLP-G578 Inspect the ONS 15454 M6 Shelf Installation and Connections, on page
DLP-G579 Measure DC Voltage on the ONS 15454 M6 Shelf, on page
Connect the PC and Log into the GUI
Use this task to inspect the shelf installation and connections and verify that
everything is installed and connected properly.
None
None
Required
Onsite
None
Use this task to measure DC voltage on the ONS 15454 M6 shelf.
Voltmeter
Before installing the DC power, check the voltage
Required
Onsite
DLP-G578 Inspect the ONS 15454 M6 Shelf Installation and Connections
document.
Cisco ONS 15454 Hardware Installation Guide
Completed
427.
427.
427

Advertisement

Table of Contents
loading

Table of Contents