Cisco ONS 15454 Hardware Installation Manual page 358

Hide thumbs Also See for ONS 15454:
Table of Contents

Advertisement

DLP-G576 Open the Standard Door of the ONS 15454 M6 Shelf
Step 2
Complete the
Stop. You have completed this procedure.
DLP-G576 Open the Standard Door of the ONS 15454 M6 Shelf
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Note
The ONS 15454 M6 shelf has an ESD plug input and is shipped with an ESD wrist strap. The ESD plug input
is located on the outside of the shelf on the left side. It is labeled "ESD" on the top and bottom. Always wear
an ESD wrist strap and connect the strap to the ESD plug when working on the ONS 15454 M6. For detailed
instructions on how to wear the ESD wristband, see the
Cisco CPT and Cisco ONS
Procedure
Step 1
Loosen the standard door screws to a torque value of 6.5 in-lb (0.75 N-m) (see the following figure).
Step 2
Push the latches in the opposite direction as shown in the following figure.
Cisco ONS 15454 Hardware Installation Guide
328
DLP-G577 Remove the Standard Door of the ONS 15454 M6 Shelf , on page
This task opens the standard door of the ONS 15454 M6 shelf.
#2 Phillips Dynamometric screwdriver
NTP-G252 Install the ONS 15454 M6 Shelf , on page 294
• Connect the chassis to the office ground. For detailed instructions on how
to ground the chassis, see the
for Cisco CPT and Cisco ONS
Required
Onsite
None
Platforms.
Installing the ONS 15454 M6 Shelf
Electrostatic Discharge and Grounding Guide
Platforms.
Electrostatic Discharge and Grounding Guide for
330.

Advertisement

Table of Contents
loading

Table of Contents