Cisco ONS 15454 Hardware Installation Manual page 388

Hide thumbs Also See for ONS 15454:
Table of Contents

Advertisement

DLP-G757 Replacing 15454-M6-AC With 15454-M6-AC2 Power module
Figure 247: AC Power Modules Installed in the ONS 15454 M6 Shelf
Step 3
Return to your originating procedure (NTP).
DLP-G757 Replacing 15454-M6-AC With 15454-M6-AC2 Power module
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Note
Refer to
Caution
Always use the supplied ESD wristband when working with a powered ONS 15454 M6. For detailed instructions
on how to wear the ESD wristband, see the
Cisco ONS
Cisco ONS 15454 Hardware Installation Guide
358
This procedure is used to replace the 15454-M6-AC with 15454-M6-AC2 power
module.
#2 Phillips Dynamometric screwdriver
NTP-G259 Open and Remove the Standard Door of the ONS 15454 M6 Shelf ,
on page
327.
Required
Onsite
None
Power Calculation, on page 478
Platforms.
to ascertain the power consumption of the shelf.
Electrostatic Discharge and Grounding Guide for Cisco CPT and
Installing the ONS 15454 M6 Shelf

Advertisement

Table of Contents
loading

Table of Contents