ABB +N5600 Firmware Instructions page 428

Single drive
Table of Contents

Advertisement

428 Parameters
No.
Name/Value
76.35
Process 1 max
scale
1.00...3000000.00
76.38
Process 1
reference change
rate
0.00...100000.00
%/interval
76.39
Process 1 ref step
interval
0.0...30000.0 s
76.41
Process 1 control
P-gain
0.000...100000.000
76.42
Process 1 control I-
time
0.0...1000000.0 s
76.51
Process 2 control
feedback src
76.53
Process 2 control
set point
76.55
Process 2 max
scale
76.58
Process 2
reference change
rate
0.00...100000.00
%/interval
76.59
Process 2 ref step
interval
0.0...30000.0 s
76.61
Process 2 control
P-gain
0.000...100000.000
76.62
Process 2 control I-
time
0.0...1000000.0 s
Description
Defines the value for the process 1 feedback and reference
unit scaling.
It is assumed that the process signal might change in range
from 0 to a value set in this parameter. This setting only
serves for rendering process unit to the percent scale and
does not limit the input in any way.
Note: when this parameter is set to 0, the process 1 feedback
and set point reference scaling is bypassed. The values are
then taken to the process PI controller input.
Process 1 max scale.
Defines the process 1 reference change step.
Together with parameter
desired dynamics for the process 1 reference are defined.
Process 1 reference change rate.
Defines the process 1 reference step change interval time.
Together with parameter
rate
the desired dynamics for the process 1 reference are
defined.
Process 1 ref step interval.
Defines the proportional gain setting for the process 1 PI
controller.
Process 1 control P-gain.
Defines the integration time setting for the process 1 PI
controller.
Process 1 control I-time.
Defines the source for the process 2 feedback signal.
See parameter
76.31 Process 1 control feedback
Defines the value for the process 2 reference set point.
See parameter
76.33 Process 1 control set
Defines the value for the process 2 feedback and reference
unit scaling.
See parameter
76.35 Process 1 max
Defines the process 2 reference change step.
Together with parameter
defines the desired dynamics for the process 2 reference.
Process 2 reference change rate.
Defines the process 2 reference step change interval time.
Together with parameter
rate, the desired dynamics for the process 2 reference are
defined.
Process 2 ref step interval.
Defines the proportional gain setting for the process 2 PI
controller.
Process 2 control P-gain.
Defines integration time setting for the process 2 PI controller. 100.0
Process 2 control I-time.
76.39 Process 1 ref step
76.38 Process 1 reference change
point.
scale.
76.59 Process 2 ref step
76.58 Process 2 reference change
Def/FbEq16
1000.0
10 = 1
1.00
interval, the
10 =1
%/interval
1.0
1 = 1s
1.000
100 = 1
100.0
10 = 1s
Motor current
%
src.
0.00
100.0
1.00
interval, it
10 =1
%/interval
1.0
1 = 1s
1.000
100 = 1
10 = 1s

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents