Transferring The Project Data To Got - Mitsubishi Electric C70 Setup Manual

Hide thumbs Also See for C70:
Table of Contents

Advertisement

MITSUBISHI CNC
2 GOT Initial Setup

2.2.5.2 Transferring the Project Data to GOT

Transfer the project data, where required settings have been made, to GOT.
(Note)
When using a CF card, refer to "Transferring the Data to GOT (Using a CF card)".
(1) Select [To/From GOT...] from the [Communication] menu.
(2) Select the "Project Download -> GOT" tab on the "Communicate with GOT" dialog box, and check the
"Communication Settings" check box. In "Drive" field, select a destination drive to transfer the project data.
Click "Download" to transfer the data to the GOT.
The GOT automatically restarts after the data is transferred.
(Note)
If OS data and project data (drawing data) are larger than the capacity of built-in flash memory, select "A:
Standard CF card" for "Drive" to store the project data in a CF card. Confirm that a CF card is inserted on
the GOT rear slot when selecting "A: Standard CF card".
52

Advertisement

Table of Contents
loading

Table of Contents