Transferring The Project Data To Got - Mitsubishi Electric C70 Setup Manual

Hide thumbs Also See for C70:
Table of Contents

Advertisement

2.1.5.2 Transferring the Project Data to GOT

Transfer the project data, where required settings have been made, to GOT.
(Note)
When using a CF card, refer to "Transferring the Data to GOT (Using a CF card)".
(1) Select [Write to GOT...] from the [Communication] menu.
(2) Check the "Communication Settings" check box on the "Communicate with GOT" dialog box. In "Drive" field, select
a destination drive to transfer the project data.
Click "GOT Write" to transfer the data to the GOT.
The GOT automatically restarts after the data is transferred.
(Note)
If OS data and project data (drawing data) are larger than the capacity of built-in flash memory, select "A:
Standard CF card" for "Drive" to store the project data in a CF card. Confirm that a CF card is inserted on
the GOT rear slot when selecting "A: Standard CF card".
C70 Setup Manual
2.1 GT Designer3
25

Advertisement

Table of Contents
loading

Table of Contents