Reinstallation Procedures - Mitsubishi Electric C70 Setup Manual

Hide thumbs Also See for C70:
Table of Contents

Advertisement

MITSUBISHI CNC
10 Data Backup and Restoration

10.1.2 Reinstallation Procedures

(1) Turn the GOT OFF and set "OFF" the CF card access switch on the back of GOT.
Insert the CF card, which contains the data such as standard functions (standard monitor OS), in the slot. Then set
"ON" the CF card access switch.
(2) Turn the GOT power ON. Keep touching the GOT screen's left top and bottom during turning ON.
When using GT1595-X or GT16, keep pressing the installation switch (S.MODE switch) on the back of the GOT
during turning the GOT ON.
Boot OS and the standard monitor OS are installed to built-in flash memory.
(3) GOT will automatically restart after the completion of installation. (If the standard monitor OS has already been
installed, press the button to restart.)
(4) Confirm that the GOT is successfully restarted, and set the GOT's CF card access switch to "OFF".
Confirm that the CF card access LED is OFF, and remove the CF card from the GOT's CF card interface.
(Note)
For details, refer to the following manuals.
For GT Designer3: "GT Designer3 Version1 Screen Design Manual (Fundamentals)" (SH(NA)-080866)
Section 8.
For GT Designer2: "GT Designer2 Version2 Basic Operation/Data Transfer Manual" (SH(NA)-080529) Section
8.
156
OFF
ON
CF card
Installation switch
(S.MODE)
or
ON
OFF

Advertisement

Table of Contents
loading

Table of Contents