5.6 Commissioning the eLight

If an eLight is installed, perform the following steps to configure it.
Issue 04 (2021-10-09)
Choose Monitoring > Power Distribution > General Input Unit > Power
Distribution Unit > Display Configuration, select Branch Information
Display corresponding to QF1 and QF2, and then tap Submit.
Configure the power distribution settings for power distribution unit 1.
Table 5-6 Power distribution settings for a power distribution unit
Path
Parameter Name
Monitoring >
QF1 Rated current (L1)
Power
QF2 Rated current (L2)
Distribution
NOTE
> General
This parameter is not
Input Unit1
displayed for some
> Power
distribution units.
Distribution
QF1 Branch circuit breaker
Unit >
in use (L1)
Running
Parameters >
QF2 Branch circuit breaker
Unhide All
in use (L2)
Advanced
Signals >
Power
Distribution
Settings
Upper load current
threshold
Lower load current
threshold
Set the parameters for other power distribution units in the same way or by
synchronizing parameters.
Path: Maintenance > Parameter Sync
Copyright © Huawei Technologies Co., Ltd.
5 Power-On Commissioning
Defaul
Description
t Value
32
Rated current 32 A
for each branch.
Enable
When the
parameter is set to
Disable for a
branch, all alarms of
the branch will not
be reported.
When the
parameter is set to
Enable for a branch,
all alarms of the
branch will be
reported.
80
When the load
current exceeds the
preset value, an
alarm is generated.
60
When the load
current is lower
than the preset
value, an alarm is
generated.