ECC800 Data Center Controller
User Manual (for ECC800-Pro)
4.
----End

5.6 Commissioning the eLight

If an eLight is installed, perform the following steps to configure it.
Procedure
Step 1 Ensure that the device address of the eLight actuator is the default value 2.
Toggle switches 1 to 4 of the DIP switch specify the device address in binary mode.
ON indicates 1, and OFF indicates 0.
Table 5-5 Setting a device address
Address
1
2
Issue 02 (2020-09-07)
Path
Parameter Name
QF1 Branch circuit breaker
in use (L1)
QF2 Branch circuit breaker
in use (L2)
Upper load current
threshold
Lower load current
threshold
Set the parameters for other power distribution units in the same way or by
synchronizing parameters.
Path: Maintenance > Parameter Sync.
Toggle
Switch 1
ON
OFF
Copyright © Huawei Technologies Co., Ltd.
Defaul
t Value
Enable
80
60
Toggle
Toggle
Switch 2
Switch 3
OFF
OFF
ON
OFF
5 Power-On Commissioning
Description
When the
parameter is set to
Disable for a
branch, all alarms of
the branch will not
be reported.
When the
parameter is set to
Enable for a branch,
all alarms of the
branch will be
reported.
When the load
current exceeds the
preset value, an
alarm is generated.
When the load
current exceeds the
preset value, an
alarm is generated.
Toggle
Switch 4
OFF
OFF
115