ECC800 Data Center Controller
User Manual
Table 5-4 Power distribution settings for a power distribution unit
Path
Monitoring >
Power
Distribution >
General Input
Unit1 > Power
Distribution
Unit > Running
Parameters >
Unhide All
Advanced
Signals >
Power
Distribution
Settings
4.
----End

5.5 Commissioning the eLight

If an eLight is installed, perform the following steps to configure it.
Procedure
Step 1 Ensure that the device address of the eLight actuator is the default value 2.
Toggle switches 1 to 4 of the DIP switch specify the device address in binary mode. ON
indicates 1, and OFF indicates 0.
Table 5-5 Setting a device address
Address
1
2
3
Issue 05 (2019-09-16)
Parameter Name
QF1 Rated current (L1)
QF2 Rated current (L2)
QF1 Branch circuit breaker in
use (L1)
QF2 Branch circuit breaker in
use (L2)
Upper load current threshold
Lower load current threshold
Set the parameters for other power distribution units in the same way or by
synchronizing parameters.
Choose Maintenance > Parameter Sync.
Toggle
Switch 1
ON
OFF
ON
Copyright © Huawei Technologies Co., Ltd.
Default
Value
32
Enable
80
60
Toggle
Toggle
Switch 2
Switch 3
OFF
OFF
ON
OFF
ON
OFF
5 Power-On Commissioning
Description
Rated current 32 A for
each branch.
When the parameter is
set to Disable for a
branch, all alarms of the
branch will not be
reported.
When the parameter is
set to Enable for a
branch, all alarms of the
branch will be reported.
When the load current
exceeds the preset value,
an alarm is generated.
When the load current
exceeds the preset value,
an alarm is generated.
Toggle
Switch 4
OFF
OFF
OFF
96