Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > Linkage Control.
Step 3 In the Linkage Group area, click Add, enter Turn on lights if door open, and click
OK. A linkage group is added.
Step 4 In the linkage group list, select the new linkage group and click Linkage Logic List
to expand the linkage logic list.
Step 5 In the Linkage Logic List area, click Add, set the linkage logic listed in the
following table, and click Submit.
Table 6-45 Linkage logic 1
Input 1
Signal-Access
Actuator Group-
Collection-Door
Status
Figure 6-84 Linkage logic diagram
Step 6 Set Turn on lights if door open to on to make the linkage logic take effect.
----End
Issue 04 (2021-10-09)
Level-1
Level-2
Category
Categor
y
DELAY
FILTER
Operator
OR
Copyright © Huawei Technologies Co., Ltd.
Description
Generally, input 2 is a constant. If input 1
meets requirements, the output starts after a
delay (unit: second) of input 2.
Generally, input 2 is a constant. If input 1
meets requirements, the output starts after a
duration (unit: second) of input 2.
Input 2
Signal-
FusionModule
Actuator Group-
Collection-Door
Status
6 Feature Description
Output
Signal-AC
Actuator Group -
Turn On Lights
230