Huawei SmartDC V100R021C10 User Manual page 233

Data center controller
Hide thumbs Also See for SmartDC V100R021C10:
Table of Contents

Advertisement

ECC800 Data Center Controller
User Manual
1.
2.
3.
4.
Step 11 Ensure that Link smoke alarm with skylight open on the Linkage Group tab
page is on.
Click Link smoke alarm with skylight open on the Linkage Group tab page. If it is in on state,
the corresponding logic configurations on the Linkage Logic List tab page are available. If it is
in off state, the corresponding logic configurations on the Linkage Logic List tab page are
unavailable.
Step 12 Check the Link smoke alarm with skylight open linkage function.
Table 6-42 Function commissioning
Check Method
When the skylight in the aisle is
closed, press the skylight button to
open the skylight.
Simulate a smoky environment under
the smoke sensor or the multi-func
sensor.
----End
Follow-up Procedure
After Link smoke alarm with skylight open linkage is triggered and the alarm is
cleared, perform the following operations:
Issue 04 (2021-10-09)
On the Linkage Group tab page, click the Link smoke alarm with skylight
open entry.
On the Linkage Logic List tab page, click Add.
Set Linkage Logic List parameters for the Link smoke alarm with skylight
open.
Figure 6-80 Link smoke alarm with skylight open logic
Click Submit.
NO TE
Press the reset button on the smoke sensor to clear the alarm.
Close the skylight manually.
Copyright © Huawei Technologies Co., Ltd.
6 Feature Description
Expected Result
● Smoke DI alarm is displayed on
the active alarm page of the app or
WebUI.
● The skylight is opened.
221

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecc800

Table of Contents