Summary of Contents for Huawei FusionModule2000-S

  • Page 1 FusionModule2000-S Smart Modular Data Center V100R021C10 User Manual Issue Date 2021-07-15 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: About This Document

    About This Document About This Document Purpose This document describes the FusionModule2000-S smart modular data center in terms of the hardware installation, cable routing, installation inspection, power-on commissioning, and operation and maintenance (O&M), helping users systematically understand the installation, commissioning, and maintenance of the FusionModule2000-S smart modular data center.
  • Page 4 FusionModule2000-S Smart Modular Data Center User Manual About This Document Symbol Description Indicates a hazard with a low level of risk which, if not avoided, could result in minor or moderate injury. Indicates a potentially hazardous situation which, if not avoided, could result in equipment damage, data loss, performance deterioration, or unanticipated results.
  • Page 5: Table Of Contents

    FusionModule2000-S Smart Modular Data Center User Manual Contents Contents About This Document........................ ii 1 Safety Information........................1 1.1 General Safety..................................1 1.2 Personnel Requirements............................... 4 1.3 Electrical Safety..................................4 1.4 Installation Environment Requirements.......................... 7 1.5 Mechanical Safety................................... 8 1.6 Cooling System Safety.................................10 1.7 Others.......................................
  • Page 6 FusionModule2000-S Smart Modular Data Center User Manual Contents 3.5.1.4 (Optional) Installing a Vertical Ground Bar......................41 3.5.2 (Optional) Installing an Enclosure Frame for the PDF..................42 3.6 Grounding a Cabinet................................44 3.7 Installing Aisle Components..............................44 3.7.1 Installing an Aisle Door..............................44 3.7.2 Combining Aisle Doors..............................50 3.8 Installing Cable Troughs and Cable Racks........................
  • Page 7 FusionModule2000-S Smart Modular Data Center User Manual Contents 5.1 Power-On Commissioning for the Cooling System....................119 5.2 Power-On Commissioning for the Power Supply and Distribution System........... 119 5.2.1 Powering On the System (Integrated UPS)......................119 5.2.1.1 (Optional) Commissioning the ATS Before Power-On................... 119 5.2.1.2 Powering On the UPS..............................122...
  • Page 8 FusionModule2000-S Smart Modular Data Center User Manual Contents 5.3.12.5 Commissioning a Network Video Recorder (IVS1800 Scenario).............. 194 5.3.12.5.1 Setting Parameters on the IVS1800 WebUI....................194 5.3.12.5.2 Setting Parameters on the iClient........................200 5.3.13 Linkage Control................................206 5.3.14 (Optional) NetEco Management..........................208 5.3.14.1 Connecting a Communications Cable........................
  • Page 9 FusionModule2000-S Smart Modular Data Center User Manual Contents 6.3.6 Parts Replacement for the New Main Way......................250 6.3.7 Replacing an rPDU................................. 250 6.3.8 Replacing a Smart rPDU............................... 251 6.3.9 Replacing Smart Cooling Product Parts........................252 6.3.10 Replacing a Smart ETH Gateway..........................252 6.3.11 Replacing a Pad................................
  • Page 10: Safety Information

    The "NOTICE", "CAUTION", "WARNING", and "DANGER" statements in this document do not cover all the safety instructions. They are only supplements to the safety instructions. Huawei will not be liable for any consequence caused by the violation of general safety requirements or design, production, and usage safety standards.
  • Page 11 FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information ● Installation or use in environments which are not specified in relevant international or national standards ● Unauthorized modifications to the product or software code or removal of the product ●...
  • Page 12 FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information ● Do not stop using protective devices. Pay attention to the warnings, cautions, and related precautionary measures in this document and on the equipment. Promptly replace warning labels that have worn out.
  • Page 13: Personnel Requirements

    Do not power on the equipment before it is installed or confirmed by professionals. 1.2 Personnel Requirements ● Personnel who plan to install or maintain Huawei equipment must receive thorough training, understand all necessary safety precautions, and be able to correctly perform all operations. ●...
  • Page 14 FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information ● Do not operate the equipment in the absence of a properly installed ground conductor. ● Ensure that the equipment is connected permanently to the protective ground. Before operating the equipment, check its electrical connection to ensure that it is securely grounded.
  • Page 15 FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information ● When the temperature is low, violent impact or vibration may damage the plastic cable sheathing. To ensure safety, comply with the following requirements: – Cables can be laid or installed only when the temperature is higher than 0°C.
  • Page 16: Installation Environment Requirements

    FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information 1.4 Installation Environment Requirements ● To prevent fire due to high temperature, ensure that the ventilation vents or heat dissipation system are not blocked when the equipment is running. ●...
  • Page 17: Mechanical Safety

    FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information ● Inspect the scaffolding, springboards, and workbenches used for working at heights in advance to ensure that their structures are solid and not overloaded. ● Any violations must be promptly pointed out by the site manager or safety supervisor and the involved personnel should be prompted for correction.
  • Page 18 FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information ● Ensure that the ladder is securely positioned. The recommended angle for a ladder against the floor is 75 degrees, as shown in the following figure. An angle rule can be used to measure the angle. Ensure that the wider end of the ladder is at the bottom, or protective measures have been taken at the bottom to prevent the ladder from sliding.
  • Page 19: Cooling System Safety

    FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information ● Be cautious to avoid injury when moving heavy objects. ● When moving the equipment by hand, wear protective gloves to prevent injuries. ● Move or lift the equipment by holding its handles or lower edges. Do not hold...
  • Page 20: Others

    FusionModule2000-S Smart Modular Data Center User Manual 1 Safety Information Refrigerant Frostbite Refrigerant leakage may cause frostbite. Take protective measures (for example, wear antifreeze gloves) when handling refrigerant. Storage and Recycling ● Do not store devices near a heat source or under direct sunshine.
  • Page 21: Installation Preparations

    FusionModule2000-S Smart Modular Data Center User Manual 2 Installation Preparations Installation Preparations 2.1 Preparing Tools and Instruments This section lists the tools and instruments required for installation. Table 2-1 General tools and instruments Tool Name, Specifications, and Appearance Protective gloves...
  • Page 22 FusionModule2000-S Smart Modular Data Center User Manual 2 Installation Preparations Tool Name, Specifications, and Appearance Right angle Electrician's knife Impact tool Heat gun Needle-nose Diagonal pliers RJ45 crimping tool Insulation tape pliers Wire stripper Hydraulic pliers Wire clippers Crimping tool...
  • Page 23 FusionModule2000-S Smart Modular Data Center User Manual 2 Installation Preparations Tool Name, Specifications, and Appearance Antifreeze gloves Cutter Welding torch 5% silver welding rod Oxygen Acetylene Hot melt device Clamp meter Pipe bender Insulation gloves Pressure gauge (1 Rubber hose (3...
  • Page 24: Installation Environment Check

    FusionModule2000-S Smart Modular Data Center User Manual 2 Installation Preparations Tool Name, Specifications, and Appearance a. The pressure gauge and rubber hoses are dedicated for R410A. The measuring range of the pressure gauge must be at least 4.0 MPa, and the rubber hoses must withstand a pressure of at least 4.5 MPa.
  • Page 25: Field Requirements

    □ Passed □ Failed condensate from smart cooling products. NO TE If any of the requirements is not met, contact Huawei technical support. 2.3 Field Requirements NO TICE To prevent condensation, a dehumidifier must be installed in the equipment room when the dew point temperature is lower than 18°C (temperature: 18°C, humidity:...
  • Page 26: Reference Documentation

    ● The cold and hot aisle containment of nine standard cabinets is used as an example in this document, which supports a maximum deployment of 24 IT cabinets. ● If the site conditions do not meet the field requirements, contact Huawei technical support.
  • Page 27 FusionModule2000-S Smart Modular Data Center User Manual 2 Installation Preparations Table 2-4 Reference documents System Component Document Category PDU8000 Modular Precision PDF V2.0 User Power Precision PDF Manual supply and distribution PDU8000 Modular Integrated PDF V1.0 Integrated PDF system Quick Guide UPS5000-E-(60 kVA–125 kVA) Quick Guide...
  • Page 28: Installation Scenario

    FusionModule2000-S Smart Modular Data Center User Manual 2 Installation Preparations NO TE The ECC800/NetEco version depends on the version in use. Click on the ECC800/ NetEco WebUI to obtain the current version. 2.5 Installation Scenario Figures in this section are for reference only. The actual installation may vary.
  • Page 29: Personnel Requirements

    Only trained and qualified personnel who fully understand basic safety precautions are allowed to perform the installation and operation. CA UTION Huawei will not be liable for the damage to devices or injury to humans caused by failure to follow instructions in this document. The requirements are as follows: ●...
  • Page 30: Hardware Installation

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Hardware Installation 3.1 Moving and Unpacking 3.1.1 Moving and Unpacking a Smart Cooling Product NO TICE ● Only trained personnel are allowed to move the equipment. Use a pallet truck to move the equipment with its case down from the transportation truck.
  • Page 31: Moving And Unpacking Smart Module Components

    Check the type and quantity of fittings against the packing list. If some fittings are missing or do not match the models in the packing list, record the information and contact your local Huawei office immediately. NO TICE ● Only trained personnel are allowed to move the equipment.
  • Page 32: Moving The Pdf

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation 3.1.3 Moving the PDF Context NO TICE ● Only trained personnel are allowed to move the PDF. Use a forklift truck to transport the PDF box secured to a wooden support to the installation position.
  • Page 33 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-1 Removing an L-shaped bracket Step 6 Raise the four leveling feet to the highest position using an adjustable wrench. Issue 03 (2021-07-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 34: Moving An It Cabinet

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-2 Raising the leveling feet Step 7 Move the PDF over its castors to the installation position. NO TE If there are bases, place the PDF on the base.
  • Page 35 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-3 Removing bolts Step 3 Remove the cabinet from the pallet and place the cabinet in the installation position. NO TE If there is a base, place the cabinet on the base.
  • Page 36: Optional) Installing Bases

    ● If there are no bases, install cabinets from the end cabinet in sequence. NO TICE If you do not use the bases provided by Huawei, determine the bearing requirements for bases according to the service plan. ● The bearing capacity of each base should be at least 2 tons.
  • Page 37: Installing Bases With Adjustable Dimension

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation ● |L1–L2| ≤ 5 mm, |L3–L4| ≤ 5 mm Figure 3-5 Single-row base layout (unit: mm) 3.2.2 Installing Bases with Adjustable Dimension Context Adjustable bases apply to PDFs, battery cabinets, IT cabinets, and smart cooling product cabinets.
  • Page 38 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Procedure Step 1 Adjust the base height. Measure the distance (H) between the concrete floor and the upper surface of the ESD floor using a ruler and record the value of H.
  • Page 39 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-7 Tightening height locking bolts Step 2 Assemble the base. Adjust the base depth based on the cabinet depth Tighten the bolt assembly on the telescopic rod. Issue 03 (2021-07-15)
  • Page 40 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-8 Assembling a base Assemble the telescopic rod and the base, and then tighten the bolt assembly. Step 3 Use a right angle to position the end cabinet base, and ensure that the outline of the upper surface of the base aligns with the cabinet bottom outline on the floor.
  • Page 41 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Step 5 Check that the installation position meets the requirements. Step 6 Use a marker to mark hole positions. Figure 3-10 Positioning Step 7 Move away the base, use a hammer drill with a φ16 drill bit to drill holes to a depth of 52–60 mm at the installation position, and install expansion sleeves.
  • Page 42: Installing Cabinets

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Step 11 Secure other bases in the same way. Step 12 Connect bases using connecting plates, as shown by (1) in below figure. Figure 3-12 Connecting bases Step 13 Screw the floor holder to the base, as shown by (2) in above figure.
  • Page 43 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-13 Cabinet layout diagram Procedure Step 1 Determine the cabinet positions based on the layout diagram. Step 2 Place all cabinets at the correct installation positions. Step 3 Level the cabinets using a wrench.
  • Page 44: Combining Cabinets

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-14 Leveling a smart cooling product cabinet (1) Level Step 4 Level other cabinets in the same way. ----End 3.4 Combining Cabinets Procedure Step 1 Level the cabinets using a wrench.
  • Page 45 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation NO TE ● Do not remove the anchor bolts. Otherwise, you need to rework them for use. ● Anchor bolt adjustment method: Wrench an anchor bolt clockwise to elevate a cabinet, or wrench an anchor bolt anticlockwise to lower a cabinet.
  • Page 46: Installing Cabinet Components

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-16 Combining cabinets ----End 3.5 Installing Cabinet Components 3.5.1 Installing IT Cabinet Components 3.5.1.1 (Optional) Installing Side Panels for IT Cabinets Context ● If IT cabinets are located at both the end and head of a row, install side...
  • Page 47 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-17 Installing side panels 1 (1) Side panels ● If a power supply and distribution equipment cabinet is located at the end of a row and an IT cabinet at the head of a row, install side panels only on the outer side of the head cabinet.
  • Page 48 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-19 Installing floating nuts Step 2 (Optional) Remove side panels based on the labels on the side panels to be adjusted. Step 3 Secure the side panels to the outside of the IT cabinet at the end of the row.
  • Page 49: Optional) Taking Out Rpdu Cables

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation 3.5.1.2 (Optional) Taking out rPDU Cables Preparations Tools: diagonal pliers Procedure Step 1 Remove the rodent-proof mesh on the top of the rPDU in a cabinet, and take out the rPDU cables from the top.
  • Page 50: Optional) Installing A Vertical Ground Bar

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-21 Removing M8 screws Step 2 Open the cabinet rear door, install the horizontal ground bar on the topmost position on the outside of the mounting bar, and secure the ground bar using the M8 screws removed earlier.
  • Page 51: Optional) Installing An Enclosure Frame For The Pdf

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation NO TE The specific securing positions are the screw holes in the middle of the 04 U, 14 U, 29 U, and 39 U positions. Figure 3-23 Installing a vertical ground bar ----End 3.5.2 (Optional) Installing an Enclosure Frame for the PDF...
  • Page 52 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Step 3 Use four M5x10 tapping screws to secure it at the front holes on the top of the cabinet. The following figure shows the installation positions. Figure 3-24 Securing the top beam Step 4 Use three M5x10 tapping screws to secure the enclosure frame to the bottom of the cabinet.
  • Page 53: Grounding A Cabinet

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation 3.6 Grounding a Cabinet Cabinets are grounded by cables connected from the main ground bar to the nearby ground grid. Figure 3-26 M-shaped grounding 3.7 Installing Aisle Components NO TICE ●...
  • Page 54 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Procedure Step 1 (Optional) Remove the LCD from the front door of the smart cooling product. NO TE ● The LCD cables have been preinstalled on the smart cooling product. You only need to remove the cable connector from the LCD.
  • Page 55 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-28 Securing the glass aisle door to the bottom of the cabinet Step 5 Install cabinet side sealing plates. NO TE Side sealing plates need to be installed only for the front doors of the cabinets at the end and head of a row.
  • Page 56 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-29 Installing a side sealing plate Secure the side sealing plate from the outside. Use four M6x16 screw assemblies to secure the side sealing plate to the aisle door frame from the outside.
  • Page 57 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-30 Installing a side sealing plate Step 6 Secure the side sealing plates. Use four M5x10 tapping screws to secure a side sealing plate to the aisle door mechanical part on the inner side of the glass door near the cabinet, as shown in the following figure.
  • Page 58 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-31 Securing a side sealing plate Step 7 (Optional) Install the LCD on the front aisle door of the smart cooling product. Install the LCD on the reserved aisle door LCD mounting kit from the front of the aisle door.
  • Page 59: Combining Aisle Doors

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-32 Securing an LCD ----End 3.7.2 Combining Aisle Doors The aisle doors are combined in the same way as the cabinets. For details, see Combining Cabinets. 3.8 Installing Cable Troughs and Cable Racks 3.8.1 Installing Cable Troughs...
  • Page 60 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-33 Cable trough components (1) Partition plate (2) Vertical plate (3) Tray When installing cable troughs, be aware of PDU2000 cables at the top of the cabinet: ● After cable troughs above the front and rear doors are installed, place the PDU2000 cables in the cable trough above the rear door.
  • Page 61 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Document: cable trough installation position diagram Procedure Step 1 Keep a vertical plate of the cable trough flush with the top surface of the cabinet and clamp the clasps into the mounting holes in the first row counting from the front door to the rear door.
  • Page 62 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation screw inside each of the two vertical plates to ensure equipotential bonding with the cabinet. Figure 3-37 Installing the other vertical plate Step 4 Press a supporting plate along the two vertical plates down to the place between the four clasps and the cable bridge.
  • Page 63 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation NO TE By default, clamp the clasps into the two holes in the middle. In actual conditions, you can select holes as required. Figure 3-39 Installing a partition plate Step 6 Install adjacent cable troughs in the same way.
  • Page 64: Installing An End Panel For A Cable Trough

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Step 8 Install the cable trough above the rear door in the same way. ----End 3.8.2 Installing an End Panel for a Cable Trough Context ● Typically, end panels are installed only on cable troughs of cabinets at the two ends of an aisle.
  • Page 65: Installing Power Supply And Distribution Devices

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation 3.9 Installing Power Supply and Distribution Devices 3.9.1 Installing a PDU2000 Procedure Step 1 Open the cabinet rear door and secure the PDU2000. Figure 3-42 Installing a PDU2000 ----End 3.9.2 (Optional) Installing a Power Distribution Box for Smart...
  • Page 66 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation NO TE In the scenario with an NMW or precision PDF, a power distribution box (PDB) needs to be installed to supply power to smart cooling products. The smart cooling product PDB weighs about 44 kg. It is recommended that the PDB be installed on a concrete wall with a thickness of at least 70 mm.
  • Page 67: Optional) Installing An Nmw

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-44 Installation layout and space requirements for a smart cooling product PDB (1) Smart cooling product PDB (2) Smart module NO TE The installation layout and space requirements for the smart cooling product PDB are for reference only and can be adjusted based on the actual situation of the equipment room.
  • Page 68: Layout And Cable Routing Principles: Single-Row Aisle Containment (N+1 Scenario)

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-45 Layout diagram (1) General input unit (2) Power distribution unit (3) Aisle containment Figure 3-46 Cabling diagram 3.9.3.2 Layout and Cable Routing Principles: Single-Row Aisle Containment (N+1 Scenario) ●...
  • Page 69: Installing An Nmw

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-47 Layout diagram (1) General input unit (2) Power distribution unit (3) Aisle containment Figure 3-48 Cabling diagram 3.9.3.3 Installing an NMW Prerequisites Install the NMW from the first IT cabinet at the end of a row.
  • Page 70 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-49 Installing supports (1) Rodent-proof mesh (2) Support connective kit for (3) Support the general input unit Step 3 Remove the covers from the general input unit. Figure 3-50 Removing the covers Step 4 Secure the general input unit to the support.
  • Page 71 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-52 Securing general input unit 2 (1) End plug NO TICE Properly store the removed end plug and install it on the end busbar trunking unit. Step 5 If an MCCB auxiliary lever is delivered, place the MCCB auxiliary lever in the side fastener of the general input unit for switching on the circuit breaker when maintaining the general input unit.
  • Page 72 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-54 Leveling and securing supports Step 8 Install the connective kit. NO TICE ● After inserting the connective kit into the busbar trunking unit, ensure that the connective kit fully comes in contact with the copper bar.
  • Page 73 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Step 10 Remove the protective cover from the busbar trunking unit. NO TICE At least two protective covers are required between the power distribution units, and between the power distribution unit and the general input unit.
  • Page 74 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Step 11 Install the power distribution unit. Figure 3-60 Installing the power distribution unit Step 12 Install an end plug for the busbar trunking unit. Figure 3-61 Installing an end plug Step 13 Install integrated management cards.
  • Page 75: Installing Monitoring Devices

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-63 Rules for installing integrated management cards (single-row aisle containment, 2N scenario) NO TICE ● The following describes how to install integrated management cards in a single-row aisle containment (2N scenario).
  • Page 76: Installing An Electronic Clasp Lock

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-64 Installing a smart ETH gateway Step 2 Connect one end of the ground cable available in the smart ETH gateway package to the ground point at the lower part of the cable trough using one M4 screw, and...
  • Page 77 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Procedure Step 1 Install the round lock tongue of the electronic clasp lock. NO TICE The electronic clasp lock closes the door by using the cam to trigger the connecting rod. The cabinet door must be open before the round lock tongue is installed.
  • Page 78 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation NO TE Ensure that the intelligent lock is closely attached to the upper part of the mounting plate. Figure 3-67 Installing an electronic clasp lock (1) C-shaped lock slot (2) Electronic clasp lock...
  • Page 79: Installing A Pad

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation 3.10.3 Installing a PAD Preparations Tool: Phillips screwdriver Materials: PAD mounting bracket, PAD Procedure Step 1 (Optional) If the feet in the lower part of the PAD mounting bracket are not as...
  • Page 80: Securing The Pad Mounting Kit

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-70 Installing a PAD ----End 3.10.4 Securing the PAD Mounting Kit Preparations Tool: Phillips screwdriver Material: PAD mounting kit Procedure Step 1 Use three M5x10 tapping screws to secure the PAD mounting kit on the upper part of the end cabinet of the smart module, as shown in the following figure.
  • Page 81: Installing An Ecc800-Pro

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-71 Securing the PAD mounting kit ----End 3.10.5 Installing an ECC800-Pro Context Tool: Phillips screwdriver Materials: ECC800-Pro, floating nut Issue 03 (2021-07-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 82 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-72 Equipment layout in the end IT cabinet Procedure Step 1 Determine the mounting holes for the ECC800-Pro on the end IT cabinet, adjust the guide rails, and install floating nuts.
  • Page 83 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-74 Installing an ECC800-Pro Step 4 (Optional) Take out the ECC800-Pro main control module and install the MicroSD and SIM cards in the correct slots of the main control module as required.
  • Page 84: Installing A Lan Switch

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Step 5 Connect the ECC800-Pro power cable to the rPDU. ----End 3.10.6 Installing a LAN Switch Context The LAN switch needs to be installed in the front of the end IT cabinet, as shown Figure 3-72.
  • Page 85: Installing An Ivs1800

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation NO TE Two power modules need to be installed for a 24-port LAN switch onsite. ----End 3.10.7 Installing an IVS1800 Context By default, the IVS1800 is delivered without disks. After the IVS1800 is delivered to the site, install hard disks as required and then install the IVS1800 in the cabinet.
  • Page 86 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-81 Installing hard disks Insert the hard disk tray back at 45 degrees with the opening of its locking buckle facing downwards, hold the screw in the red-framed part to lower the hard disk tray until it is level, and fasten the black screws on the left and right sides and the white screw on the top.
  • Page 87 If the vents are blocked, change the guide rails. ● Huawei provides guide rails that can be adjusted from 500 mm to 800 mm for additional purchase if required for IVS1800 installation.
  • Page 88 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-86 Installing a guide rail Install a filler panel for guide rails. Fasten the M6 screws to install the filler panel for the guide rails. Figure 3-87 Installing a filler panel for guide rails Install the cage nuts that secure the IVS1800.
  • Page 89: Optional) Installing A Taishan 200 Server

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-89 Installing mounting ears Install the IVS1800 in the cabinet. 1. Lift the device from both sides and carefully position it at the front of the cabinet. 2. Lift the device slightly above the guide rails, gently place it on the guide rails, and then slide it into the cabinet until the mounting ears of the subrack contact the mounting bars at the front of the cabinet.
  • Page 90 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Procedure Step 1 Determine the installation position of the server and check whether floating nuts are installed. If not, install them first. Figure 3-91 Installing a floating nut Step 2 Lift the server. This task requires at least two people.
  • Page 91: Installing A 2288X V5 Server

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-93 Connecting the power cable Use a hook-and-loop fastener to secure the power cable. Figure 3-94 Securing the power cable Route the power cable along the cable tray neatly, use cable ties to bind the power cable, and use diagonal pliers to trim off the excess of the cable ties.
  • Page 92 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Context Tool: Phillips screwdriver Materials: 2288X V5 server, guide rail, rubber plug, screw Procedure Step 1 Install guide rails. Figure 3-95 Installing a guide rail Place a guide rail horizontally at the installation position in the cabinet.
  • Page 93: Installing A Camera

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-96 Installing a server Step 4 Connect the server power cables to the PDU2000. NO TE The server uses dual power supplies. Connect the two power cables to different PDU2000s.
  • Page 94 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Context This section describes how to install and commission a camera. Two persons are required for the commissioning. NO TE For details about how to install a camera, see the documents delivered with it.
  • Page 95 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Step 2 Install the mounting plate with the camera at the top of the front door of the end cabinet, as shown in Figure 3-100. Figure 3-100 Installing the camera mounting plate Step 3 Connect the camera monitoring cable.
  • Page 96 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Assign one person to observe the image on the monitor, and another person to adjust the Zoom bolt (T–W) for an appropriate angle of field. Assign one person to observe the image on the monitor, and another person to adjust the focus bolt (∞–N) for a clear picture.
  • Page 97: Rules For Deploying T/H Sensors

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation NO TICE Before installing the camera front cover, remove the protective film from it. Figure 3-103 Installing the front cover ----End 3.10.11 Rules for Deploying T/H Sensors T/H sensors are deployed based on cold and hot aisles.
  • Page 98: Installing T/H Sensors (02312Pbl)

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation NO TE ● If the number of IT cabinets on both sides of the smart cooling product is the same, preferentially deploy the sensors on the left cabinet. ● If the number of IT cabinets on both sides of the smart cooling product is different, evenly deploy the sensors based on the actual situation of cabinets.
  • Page 99 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation NO TE ● The T/H sensor can be installed between the 33 U and 40 U positions based on site requirements. ● Install the front-door T/H sensor on the left door post, and the rear-door T/H sensor on the right door post.
  • Page 100 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Set the device address for a T/H sensor by operating the DIP switch on the sensor. DIP switches 1–6 are used to set the device address, DIP switch 7 is reserved, and DIP switch 8 is used to switch the temperature display mode.
  • Page 101: Optional) Installing T/H Sensors (33010516)

    FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-109 Cable connections to T/H sensors and temperature sensors Figure 3-110 Cable connections to T/H sensors (1) ECC800-Pro (2) T/H sensor 2 (3) T/H sensor 1 (4) T/H sensor 3...
  • Page 102 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation NO TE The T/H sensor can be installed between the 33 U and 40 U positions based on site requirements. Figure 3-111 Installing T/H sensor 1 Issue 03 (2021-07-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 103 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-112 Installing T/H sensor 2 Issue 03 (2021-07-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 104 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-113 Connecting a T/H sensor cable Step 2 Set the DIP switch on the T/H sensor. For details, see Table 3-3. Table 3-3 DIP switch settings on T/H sensors...
  • Page 105: Installing A Smoke Detector

    3 Hardware Installation NO TICE ● The default address of T/H sensors purchased from Huawei is 1. ● Keep the last RS485_R toggle switch in OFF position. ● After the addresses are set, power on the device, choose Settings > System Settings >...
  • Page 106 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-114 Detector position (1) Water detector Issue 03 (2021-07-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 107 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-115 Water sensor (1) Water detector (2) Conversion cable end A, (3) Conversion cable connected to the water detector (4) Conversion cable end B, (5) Water detection cable end...
  • Page 108 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation (1) Water detector NO TICE Do not contact the water detection cable to metal, for this action will cause a false alarm. Take protective measures when routing a water detection cable.
  • Page 109 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-117 Removing the cover from the water detector Use two M3 screws to secure the bottom plate of the water detector to the bottom of the equipment, as shown in Figure 3-118.
  • Page 110 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-119 Connecting the cables (1) Conversion cable end B, connected to the (2) Water detection cable end A, connected to water detection cable the conversion cable NO TE The water detection cable and conversion cable are interconnected through male and female connectors.
  • Page 111 FusionModule2000-S Smart Modular Data Center User Manual 3 Hardware Installation Figure 3-121 Installing a fastener Step 7 Place the water detection cable onto the fasteners, secure the fasteners, and keep the water detection cable in close contact with the floor, as shown in Figure 3-122.
  • Page 112: System Cabling

    FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling System Cabling 4.1 System Cabling Rules Attaching Cable Labels Find the corresponding cable based on the wiring diagram in the cable fitting bag, and attach the corresponding cable label taken out from the cable fitting bag to both ends of the cable by wrapping the ends.
  • Page 113 FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling Figure 4-1 Neatly organizing cables Keep a large number of cables neat and appealing in the network cabinet by using cable organizers. Move the excess parts of cables in unnoticeable positions.
  • Page 114 FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling Figure 4-3 Binding cables in different colors Cable Spacing Requirements Comply with the following requirements if possible to lay out different types of cables: Separate AC and DC power cables from diverse non-shielded signal cables.
  • Page 115 FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling If a number of wire terminals are connected to a multi-point connector, provide slack and arrange them neatly to prevent stress on certain wires, as shown in Figure 4-5. Figure 4-5 Cable connections Protect cable holes in a metal kit with grommet strips.
  • Page 116 FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling Figure 4-6 Cutting off the excess part of a cable tie Do not use cable ties at a place where the cables are bent. Otherwise, the cable cores may break due to strong stress, as shown in Figure 4-7.
  • Page 117: Installing New Main Way Cables

    FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling Figure 4-8 Direction for securing cable ties 4.2 Installing New Main Way Cables Procedure Step 1 Install an equipotential ground cable. Figure 4-9 Installing an equipotential ground cable Step 2 Install AC input power cables.
  • Page 118 FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling NO TICE ● Only one cable can be connected to a wiring terminal of the general input unit. ● You are advised to install cables from the bottom up. ● If the input MCCB current level is 250 A, the No. 1 screw is M10 and the No. 2 screw is M12.
  • Page 119 FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling Check whether the round connector is securely installed. You can slightly pull the connector to check whether it is loose. If it is loose, install it again. NO TICE ● When a cable terminal is connected in place, you will hear a click.
  • Page 120 FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling Figure 4-12 Installing load cables (1) Ring buckle (2) Spring buckle (3) Red line Step 6 Install cascading cables. NO TICE If a 48 V cascading cable needs to be prepared onsite, ensure that the wire with a red tube is inserted into the terminal pin marked in red and the wire with a black tube is inserted into the terminal pin marked in blue.
  • Page 121 FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling Figure 4-13 General input unit cabling Figure 4-14 Power distribution unit cabling Issue 03 (2021-07-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 122: Connecting A Monitoring Cable To The Smart Eth Gateway

    FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling Figure 4-15 N+1 scenario Figure 4-16 2N scenario ----End 4.3 Connecting a Monitoring Cable to the Smart ETH Gateway Prerequisites The smart ETH gateway has been installed. Context Figure 4-17 shows the external ports on a smart ETH gateway.
  • Page 123: Connecting Cabinet Electronic Clasp Lock Cables

    FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling Figure 4-17 Ports on a smart ETH gateway (1) PWR_IN cascading power (2) FE_1 cascading signal port (3) PoE_1–2 ports port (4) PoE_3–4 ports (5) 48V_OUT1 power output (6) 48V_OUT2 power output...
  • Page 124: Routing Power Cables For The Pad And Wifi Module

    FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling Procedure Step 1 Install cabinet electronic clasp lock cables according to the cabinet electronic clasp lock layout. Cascade the cabinet electronic clasp locks of odd- and even-numbered cabinets hand-in-hand respectively.
  • Page 125: Connecting Ivs1800 Cables

    FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling Figure 4-19 Cabling routes for the PAD and WiFi module NO TE Place the cable of the WiFi module above the ECC800-Pro. ----End 4.6 Connecting IVS1800 Cables 4.7 (Optional) Connecting rPDU Cables...
  • Page 126: Optional) Cabling Routes For A Smart Cooling Product Pdb

    FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling Figure 4-20 Connecting rPDU cables Step 2 Route the rPDU cables through the cable hole in the attachment plate of the side ear and connect the cables to the AC Input1 power port on the ECC800-Pro.
  • Page 127 FusionModule2000-S Smart Modular Data Center User Manual 4 System Cabling Figure 4-21 Cabling routes for a smart cooling product PDB NO TE The figure is for reference only. The actual scenario may vary. Issue 03 (2021-07-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 128: Power-On Commissioning

    CA UTION Perform system commissioning and power-on strictly according to the system manual and ATS instructions. For any changes in operations and parameters, consult Huawei engineers. Otherwise, system commissioning or power-on may fail, or even the cabinet is damaged. Procedure Step 1 Switch on all SPD circuit breakers in the integrated UPS.
  • Page 129 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Step 3 Turn on the circuit breakers of the ATS operation mechanism (Q1 and Q2 in the left lower part at the rear of the cabinet) to power on the ATS operation mechanism.
  • Page 130 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Item Value Description Generator Usage No Generator; Generator In The default value is No generator. Set the parameter based on site requirements. Power supply Line 1-Switch I; Line 2- The default value is priority Switch II;...
  • Page 131: Powering On The Ups

    Step 1 (Skip this step in the case of ATS input.) Turn on the MCCB. Step 2 Turn on the UPS input circuit breaker QF1. The UPS is powered by the mains and initialization begins. The LCD displays the Huawei logo and an initialization progress bar. ----End 5.2.1.3 Initial Startup NO TICE ●...
  • Page 132: Settings Wizard

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Procedure Step 1 Download and install the Service Expert app. Step 2 On the app home screen, tap StartUp to access the Set Startup screen. ● Online Startup Insert the WiFi module into the USB port on the MDU. Enable the mobile phone WLAN, search for the UPS_WIFI signal, and connect to the WiFi signal.
  • Page 133 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-1 Settings Wizard NO TE ● Set the time and date correctly. Incorrect time and date will cause false fault analysis during maintenance or repair. ● After you set network parameters, connect the UPS to the network over a network cable, which enables you to remotely manage the UPS.
  • Page 134: Starting The Inverter

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Step 3 If the system has connected to the remote EPO switch, you need to choose System Info > Settings > System Setting and set EPO detection to Enable. Step 4 View the system running diagram on the MDU to check that the UPS is working in bypass mode.
  • Page 135: Optional) Setting Bsc Mode

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning NO TICE After the UPS is started for the first time, perform a battery capacity test to ensure that battery parameters are correctly displayed. Step 3 (Optional) Switch on the lighting output circuit breaker in the integrated UPS and check whether the PWR indicator on the fusion module actuator lights up.
  • Page 136 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-2 Standard BSC mode Step 2 Set the master BSC system. On the LCD of a UPS, choose System Info > Settings > System Settings and set BSC master/slave system to BSC master system.
  • Page 137: Powering On Batteries

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning 5.2.1.7 Powering On Batteries Prerequisites ● Turn on the ready switch on the BCU. ● Ensure that the UPS runs stably in normal mode and the rectifier in the energy flow diagram is started.
  • Page 138 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning NO TICE ● The BCB off alarm (the red indicator is steady on) is displayed on the SmartLi LCD. No action is required. After the battery circuit breaker is switched on, the alarm is automatically cleared.
  • Page 139 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-5 System Param. Item Description Default Value Range Value Battery cabinet Total number of battery 1–15 quantity cabinets. Pooling If this parameter is set to Disable Disable, Enable Enable, the system allows battery pooling.
  • Page 140 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Item Description Default Value Range Value Copper bar If this parameter is set to Enable Disable, Enable overtemperature Enable, an alarm is reported when the copper bar is overheated. Abnormal...
  • Page 141: Powering On The System (Integrated Pdf)

    ● After the first login, change the password in time to improve account security and prevent unauthorized network attacks, such as data tampering. Huawei will not be liable for any security issues caused by your failure to change the preset password in time or password loss after changing.
  • Page 142 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-7 Initial passwords System User Initial Password admin (system administrator) 000001 operator (common user) 000001 Step 6 Perform quick settings. Table 5-8 Settings Wizard Item Parameter Setting Language Set as required.
  • Page 143: Powering On The System (Precision Pdf)

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning NO TE ● When switching on an output circuit breaker, check whether the mapping between the circuit breaker and the downstream device is consistent with that in the design drawing.
  • Page 144 – After the first login, change the password in time to improve account security and prevent unauthorized network attacks, such as data tampering. Huawei will not be liable for any security issues caused by your failure to change the preset password in time or password loss after changing.
  • Page 145: Powering On The System (Nmw)

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Item Parameter Setting Network IP address assign DHCP Automatic Param. System Rated frequency Set as required. Param. Rated line voltage Set as required. Check whether there is any alarm on the monitoring screen. If there is, clear Turn on the input switch in the PDF.
  • Page 146 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Procedure Step 1 Power on the PDB. Switch on the SPD circuit breaker in the PDB. Turn on the upstream power input switch to power on the PDB. Check that the voltage and frequency are within the normal ranges.
  • Page 147: Commissioning A Smart Rpdu

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Distribution > General Input Unit > Power Distribution Unit > Running Parameters > Unhide All Advanced Signals > Power Distribution Settings. ----End 5.2.5 Commissioning a Smart rPDU Prerequisites One end of the straight-through cable has been connected to the COM port on the rPDU and the other end has been connected to the COM port on the ECC800- Pro or ETH converter.
  • Page 148 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning NO TE The display of a single-phase module is used as an example. – After the PDU2000-M (C) is powered on, the LCM displays the initialization screen. Figure 5-6 PDU2000-M (C) initialization screen –...
  • Page 149 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-8 PDU2000-M (H) communications settings – Press DOWN and UP to select the address to be set. – Press MENU to confirm the settings. NO TE If modification is successful,...
  • Page 150: Power-On Commissioning For The Management System

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning – If the connection fails, check whether the cable is properly connected to the device, whether the device is running properly, and whether the parameter settings are consistent with the device parameters.
  • Page 151 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Step 2 Configure the PC IP address and the WAN1 IP address in the same network segment. If the WAN1 port IP address is 192.168.8.10, subnet mask is 255.255.255.0, and default gateway is 192.168.8.1, set the PC IP address to 192.168.8.12, subnet mask...
  • Page 152 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-10 Adding an address Enable file download and set the security level of the trusted site to low. Figure 5-11 Setting parameters NO TE When switching between different versions of the ECC800-Pro on your PC, you are advised to clear the historical Internet Explorer cache.
  • Page 153: Preparations And App Login

    – After the first login, change the password in time to ensure account security and prevent unauthorized network attacks, such as data tampering. Huawei will not be liable for any security issues caused by your failure to change the preset password in time or password loss after changing.
  • Page 154 ● Huawei AppGallery installed on the PAD Log in to the Huawei AppGallery client, search for FusionModule, and tap Install. Huawei AppGallery is preinstalled on Huawei PAD by default. ● Huawei AppGallery not installed on the PAD...
  • Page 155 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Step 2 Hold down the SW button on the ECC800-Pro for less than 3s to enable the WiFi function. NO TE ● The initial password is Changeme after the WiFi function is enabled. The password is valid only after you hold down the button for the first time to enable the WiFi function.
  • Page 156: Initial Startup Password Authentication

    – Huawei AppGallery installed on the PAD Log in to the Huawei AppGallery client, search for Service Expert, and tap Install. Huawei AppGallery is preinstalled on Huawei PAD by default. – Huawei AppGallery not installed on the PAD Issue 03 (2021-07-15) Copyright ©...
  • Page 157 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-15 Operation methods for the scenario where Huawei AppGallery is not installed on the PAD Method Procedure Installation Verification Install the app 1. Log in to Huawei Check that the app...
  • Page 158: Facial Recognition

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning If the message displayed on the page is changed from "Initial startup password authentication" to "Activated", the startup password authentication is complete. NO TE – After the first login, change the password in time to ensure system access security.
  • Page 159: Maintaining The Facial Data

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-13 Recording facial data Table 5-16 Facial data to be recorded Item Function Tap this icon to start recording facial data. Select the access actuator associated with the facial data.
  • Page 160: Commissioning Configuration Wizard

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-17 Facial recognition management functions Operation Purpose Modify the access actuator associated with the user. Delete the facial data. Step 4 Tap OK. ----End 5.3.5 Commissioning Configuration Wizard Context ●...
  • Page 161: Configuring Event Notification

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning 5.3.6 Configuring Event Notification You can set alarm notification by email or SMS as required. Information about a maximum of 20 users who will receive alarm notification can be displayed.
  • Page 162 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-14 Email setting page NO TE The following email addresses are for reference only (the actual parameters apply) and are used only for configuring the email function. Table 5-18 Main parameters on the outbox configuration page...
  • Page 163 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Email Email Mailbox Server Encryption Remarks Type Server IP Address Mode and Domain SMTP port Name ● If the email Hotmail smtp- TLS encryption: type is not mail.outloo in the list, k.com...
  • Page 164 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning NO TE The mobile phone number is used only for configuring the SMS function and is not used for other purposes. The phone number is encrypted during transmission in the ECC800-Pro to ensure that the personal data of users is fully protected.
  • Page 165 If the email address fails to be set, rectify the fault based on the handling suggestions of the error codes listed in the following table. If an error code is not listed in the following table, provide the ECC run log and contact Huawei technical support.
  • Page 166 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Type Error Code Suggestion Check whether the IP address corresponding to the domain name of the email server is configured. 1. Check whether the IP address of the DNS server is correct.
  • Page 167: Setting The Date And Time

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Type Error Code Suggestion Failed to send Check whether the outbox address matches the test email. the user name for logging in to the email server. 1. Log in to the email box of the email sender and start the SMTP service.
  • Page 168: Creating A Smart Module Plan View

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Procedure Step 1 Choose System Settings > System Parameters > Time. Step 2 Set the time zone, date, and time, or click Obtain Local Time. Then, click Submit. Step 3 (Optional) If you want to use the NTP server for time synchronization, select NTP server sync.
  • Page 169: Commissioning The New Main Way

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-20 Setting the high-density island solution ----End 5.3.9 Commissioning the New Main Way Context ● In the new main way scenario, general input units and power distribution units communicate with the ECC800-Pro using the Modbus-MAC protocol.
  • Page 170 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Path Parameter Default Setting Name Value Rated system Set based on actual current conditions. NOTE NOTE This Set this parameter to a parameter is value consistent with not displayed the information on the...
  • Page 171: Commissioning Sensors

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-21 Power distribution settings for a power distribution unit Path Parameter Name Default Description Value Monitoring > QF1 Rated current (L1) Rated current 32 A Power for each branch.
  • Page 172: Commissioning A Wld900 Water Sensor

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Procedure Step 1 Set smoke detector parameters. Log in to the ECC800-Pro WebUI as an administrator. Choose System Settings > Signal Name Modify. The Batch Signal Configuration page is displayed.
  • Page 173: Commissioning A T/H Sensor

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Procedure Step 1 Set water sensor parameters. NO TE The default alarm severity of the AI/DI port is Minor. If you want to change the alarm severity, see How Should I Configure Alarm Parameters.
  • Page 174 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning DIP switch 8 is used to switch the temperature display mode. The device address is set in binary mode. 1 is the least significant bit, and 6 is the most significant bit.
  • Page 175 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-25 Adding a T/H sensor Path Parameter Value Choose Device Select Sensor from the drop-down list box. System Attribute Settings > Device Type Select T/H sensor from the drop-down list Device box.
  • Page 176: Commissioning Cabinet Electronic Clasp Locks

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-27 Default alarm thresholds for T/H sensors Signal Default Value High temperature alarm threshold 45.0℃ Low temperature alarm threshold 10.0℃ High humidity alarm threshold 85.0% RH Low humidity alarm threshold 15.0% RH...
  • Page 177 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Procedure Step 1 (Optional) Check whether the cabinet door lock is leveled to 2000 (+3) mm. If not, adjust it. Step 2 (Optional) If the cabinet door still cannot be opened after Step 1 is performed, adjust the position of the cabinet electronic clasp lock by using the slotted holes until the cabinet door can be opened and closed properly.
  • Page 178 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-28 Setting a device address Address Switch 1 Switch 2 Switch 3 Switch 4 Switch 5 Switch 6 Step 4 Add a cabinet electronic clasp lock. Log in to the ECC800-Pro WebUI as an administrator.
  • Page 179 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning – If the connection is abnormal, check whether the device is properly connected to the ECC800-Pro, whether the device and the ECC800-Pro are running properly, and whether the parameter settings are consistent with the device parameters.
  • Page 180 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Step 6 When closing the door, rotate the lock handle vertically downwards. If the door cannot be opened or closed properly, locate the fault. Check whether there is friction between the lock tongue and the electronic clasp lock.
  • Page 181: Video Management

    Before commissioning a camera, prepare the following documents in addition to this document. Table 5-31 Commissioning documents Component Document C3220 Huawei C Series SDC 8.0.1 Product Documentation IVS1800 IVS1800 8.1.0 Product Documentation 5.3.12.2 Networking Scenarios Smart ETH Gateway Networking Scenario ●...
  • Page 182 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-26 Camera + IVS1800 connecting to the smart ETH gateway NO TICE ● To ensure the normal operating of the ECC800-Pro services, avoid high data traffic, such as the concurrent display of dynamic monitoring of cameras and IVS1800 video playback.
  • Page 183: Commissioning A Camera (Lan Switch Networking Scenario)

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning 5.3.12.3 Commissioning a Camera (LAN Switch Networking Scenario) 5.3.12.3.1 Commissioning a C3220 Camera Prerequisites If multiple cameras are accessed, retain the connection of one camera and disconnect connections from other cameras. After commissioning the connected camera, commission other cameras in the same way.
  • Page 184 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-32 Internet Explorer settings Settings Procedure Disable the proxy server. 1. Choose Tools > Internet Options. The Internet Options dialog box is displayed. 2. Click the Connections tab. 3. Click LAN Settings.
  • Page 185 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Settings Procedure Set Use Pop-up Blocker to Disable. 1. Choose Tools > Internet Options. The Internet Options dialog box is displayed. 2. Click the Security tab. 3. Select Internet. 4. Click Custom level.
  • Page 186 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-33 IP address parameters Parameter Description IPv4 address Method for obtaining the IP address. The options are assignment Obtain IP address automatically and Use the following IP address. The default value is Obtain IP address automatically.
  • Page 187 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-29 Setting primary stream parameters Issue 03 (2021-07-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 188 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-30 Setting secondary stream 1 parameters Issue 03 (2021-07-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 189 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-34 Video stream parameters Parameter Description Primary stream/ Set the stream type based on the site requirements. Secondary – Primary stream: The primary streams feature high stream bit rate, definition, and bandwidth usage. They are applicable to local storage.
  • Page 190 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Parameter Description Resolution A higher resolution indicates clearer images and higher bandwidth consumption. Bit rate type This parameter is available only when you set Encoding protocol to H.264 or H.265.
  • Page 191: Commissioning A C3220 Camera (Sd Card Configured)

    If the IVS1800 is not configured and an SD card is chosen, perform the following procedure. Procedure Step 1 Log in to the Huawei camera WebUI. Configure the PC IP address and the camera IP address in the same network segment. Enter the camera IP address (192.168.0.120 by default) in the address bar of the Internet Explorer and press Enter.
  • Page 192 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-31 Setting the IP address of the camera Format the SD card. Choose Settings > System Configuration > Storage Management. Format the SD card after the Storage Management page is displayed.
  • Page 193 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning NO TE If longer-time video storage is required, set camera parameters according to the following table. Table 5-35 Camera configuration parameters Condition Result Encoding Resolutio Frame I-Frame Minimum Supporte Protocol...
  • Page 194: Commissioning A Camera (Smart Eth Gateway Networking Scenario)

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-34 Setting the alarm linkage policy ----End 5.3.12.4 Commissioning a Camera (Smart ETH Gateway Networking Scenario) 5.3.12.4.1 Commissioning a C3220 Camera Prerequisites ● If multiple cameras are connected, commission one camera first and then commission other cameras in the same way.
  • Page 195 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-36 IP address planning Device Internal IP Address External IP Address Camera Example: 192.168.248.50; range: Camera external IP 192.168.248.50–192.168.248.199 address NOTE The 192.168.246.X network segment cannot be set. IVS1800 Example: 192.168.248.51;...
  • Page 196 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-37 Internet Explorer settings Settings Procedure Disable the proxy server. 1. Choose Tools > Internet Options. The Internet Options dialog box is displayed. 2. Click the Connections tab. 3. Click LAN Settings.
  • Page 197 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Settings Procedure Set Use Pop-up Blocker to Disable. 1. Choose Tools > Internet Options. The Internet Options dialog box is displayed. 2. Click the Security tab. 3. Click Internet. 4. Click Custom level.
  • Page 198 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Enter https://192.168.248.10 in the address box of the browser and press Enter to access the WebUI login page. After login, choose System Settings > Video Management. (Optional) Click Search. NO TE –...
  • Page 199 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning ● Link: Enter the external IP address of the camera (for example, https:// external IP address of the camera ). ● Change IP camera ONVIF interface access password: The default password of ONVIF is HuaWei123, which is different from the web user password.
  • Page 200 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Choose Settings > Video/Audio/Image > Video Settings, and set camera stream type, primary stream, and secondary stream 1 parameters, as shown in the following figures. NO TICE Set the encoding protocol to H.265.
  • Page 201: Commissioning A C3220 Camera (Sd Card Configured)

    If the IVS1800 is not configured and an SD card is used, perform the following procedure. Procedure Step 1 Log in to the Huawei camera WebUI. Step 2 Format the SD card. Choose Settings > System Configuration > Storage Management.
  • Page 202 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-43 Setting audio and video parameters NO TE If longer-time video storage is required, set camera parameters according to the following table. Table 5-38 Camera configuration parameters Condition Result...
  • Page 203: Commissioning A Network Video Recorder (Ivs1800 Scenario)

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Step 5 Set the deployment policy. Figure 5-44 Setting the deployment policy Step 6 Set the alarm linkage policy. Figure 5-45 Setting the alarm linkage policy ----End 5.3.12.5 Commissioning a Network Video Recorder (IVS1800 Scenario) 5.3.12.5.1 Setting Parameters on the IVS1800 WebUI...
  • Page 204 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning ● IP address: 192.168.3.111 ● Subnet mask: 255.255.255.0 ● Gateway address: 192.168.3.1 IP address :8443 in the address box, and press Enter. Step 2 Enter https:// IP address indicates the IP address of the IVS1800.
  • Page 205 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-39 RAID mode description Parameter Name Description RAID High Reliability – RAID5 RecommendedFour or more hard disks are required, and one hard disk is used as the hot spare disk.
  • Page 206 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-47 Configuring the server (Single Mode by default) NO TE Set Business IP to XXX.XXX.XXX.XXX, Subnet mask to 255.255.255.0, and Gateway IP to XXX.XXX.XXX.XXX. The values here are examples. The actual values may vary.
  • Page 207 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning NO TE If no external IP address is mapped, retain the default value of NatRtspServerPort. (2) Configure the OMU: Set Module Name to OMU and click Search. Click Edit in the row where the value of Parameter Name is OMUNNatIP and set Value to the MUNNatIP address of the MU.
  • Page 208 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Module Parameter Setting Name Name MUNNatIP Northbound IP address of the IVS1800, which must be the same as the NAT-mapped IP address configured on the firewall. NatRtspServer NAT port number of the IVS1800 MU, which...
  • Page 209: Setting Parameters On The Iclient

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning connects to the camera. After the camera NTP synchronization function is enabled on the server, cameras will automatically synchronize time with the server. Log in to the OMU portal as user admin.
  • Page 210 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Method 1 Obtain the iClient installation program from the OMU portal. Log in to the OMU portal, click Client Download in the upper right corner, and save the installation program to a local directory.
  • Page 211 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-52 Logging in to the iClient Step 2 Connect to the IVS1800 device. If you log in for the first time, you need to add an IVS1800 device by selecting Manual Access by IP Segment.
  • Page 212 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning NO TE – If the iClient and IVS1800 are deployed in the same LAN, set Address to the internal IP address of the IVS1800. If the iClient is installed on an external network and the IVS1800 is deployed in the LAN, set Address to the external IP address of the IVS1800.
  • Page 213 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-55 Searching by IP address NO TE – The driver protocol of IPC6325 and C3220 cameras is HWSDK. – The IP address segment indicates the start and end IP addresses of cameras.
  • Page 214 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Step 4 Configure a recording policy. Choose System Management > Devices > Device Management > Micro Edge on the iClient home page. Right-click a device and choose Storage Management. Figure 5-57 Selecting Storage Management Click Storage Policy and configure a storage policy.
  • Page 215: Linkage Control

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-59 Server Recording Plan Click Save. ----End 5.3.13 Linkage Control Prerequisites ● You have obtained the IP address of the ECC800-Pro as well as the user name and password used for WebUI login.
  • Page 216 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-60 Creating a smart module Figure 5-61 Aisle type Step 2 Click Modify Device. Drag the icons of registered devices and devices on the cabinet list to appropriate positions in the layout to create a smart module plan view.
  • Page 217: Optional) Neteco Management

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-62 Setting the high-density island solution Step 4 Go to the linkage control page and check that Enable linkage control function is set to Yes. Set the linkage control signals in the high-density island scenario to on.
  • Page 218 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning 4G Networking 4G communication can be used to access the NetEco management system that has a public IP address. Step 1 Loosen the screws on both sides of the panel of the ECC800-Pro main control module.
  • Page 219: Setting Neteco Parameters

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-67 Installing a 4G antenna ----End 5.3.14.2 Setting NetEco Parameters Procedure Step 1 Apply for a fixed IP address to the equipment room network administrator. Step 2 Set ECC800-Pro communications parameters.
  • Page 220 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Table 5-43 Mobile data Path Paramete Default Setting Value Choose Mobile Disable Set this parameter to Enable and System data click Submit. Settings > control System Paramete rs > Mobile Data.
  • Page 221: Obtaining The Neteco Software License

    5.3.14.3 Obtaining the NetEco Software License The NetEco software license is not provided together with software to the customer. Therefore, obtain the NetEco software license in advance. Obtain the license from the Huawei's enterprise support website. ● For enterprise users: Log in to Huawei's enterprise support website https:// support.huawei.com/enterprise.
  • Page 222: Logging In To The Powerecho

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-68 Power button on the 2288X V5 server Figure 5-69 TaiShan 200 server power button ----End 5.3.14.5 Logging In to the PowerEcho The PowerEcho uses the browser/server (B/S) working mode. You can manage and maintain the NetEco system server after logging in to the PowerEcho over the browser on a PC.
  • Page 223: Neteco Menu Settings

    ● After the first login, change the password in time to ensure account security and prevent unauthorized network attacks, such as data tampering. Huawei will not be liable for any security issues caused by your failure to change the preset password in time or password loss after changing.
  • Page 224: Loading The Neteco Software License

    Huawei will not be liable for any security issues caused by your failure to change the preset password in time or password loss after changing.
  • Page 225: Installing Ne Adapters

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Step 4 Click Apply. ----End 5.3.14.9 Installing NE Adapters Install the NE adapters on the NetEco. Prerequisites You have obtained the adapter software installation packages. Procedure Choose Device Management > Configuration > Device Integration.
  • Page 226: Example: Adding A Smart Module

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Step 3 Choose the upper-layer node of the management domain to be added in the navigation tree on the left. Step 4 In the Domain area on the lower left of the page, drag a management domain icon to the required position in the planning configuration area.
  • Page 227 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Figure 5-70 Adding the smart module in the room area Step 6 Modify Management Info of the smart module as required or retain the default values. Step 7 Click on the toolbar to save the settings.
  • Page 228 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning Related Procedure Operatio Delete You can delete one module or multiple modules in batches on the modules current page. NOTE If a module contains subdevices, you cannot delete it. You can delete the module only after you delete subdevices in the module.
  • Page 229: Creating An Ecc800-Pro On The Neteco

    FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning 5.3.14.11 Creating an ECC800-Pro on the NetEco Prerequisites ● You have logged in to the NetEco client using a web browser. ● You have created modules in Data Center Planning.
  • Page 230 FusionModule2000-S Smart Modular Data Center User Manual 5 Power-On Commissioning NO TE Click OK, and you can view the task information, including Type, Device Name, Management Domain, Progress, Status, Start Time, End Time, and Detailed Information in the displayed window.
  • Page 231: Operation And Maintenance

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Operation and Maintenance 6.1 Routine Maintenance 6.2 Alarm Handling 6.3 Parts Replacement 6.1 Routine Maintenance 6.1.1 Daily Maintenance Table 6-1 Daily maintenance Maintenance Method Expected Result Troubleshooting Item Check alarms.
  • Page 232: Monthly Maintenance

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Maintenance Method Expected Result Troubleshooting Item Check the status On the ECC800- The power supply See the power of power supply Pro WebUI, choose and distribution supply and and distribution Monitoring >...
  • Page 233 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Maintenance Method Expected Result Troubleshooting Item Surge protection Check the ● The surge ● Replace the module surge protection surge protection protection module indicator module if its module is steady green.
  • Page 234 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Table 6-3 Monthly maintenance for the cooling system Maintenance Expected Result Item Method Troubleshooting Condensate water Visual The condensate pan Clean up the scale pan and liquid inspection and liquid level...
  • Page 235: Quarterly Maintenance

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Maintenance Expected Result Item Method Troubleshooting Visual The screws on the Tighten loose inspection indoor fan are not screws. loose or distorted. Table 6-4 Monthly maintenance for the management system...
  • Page 236 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Table 6-6 Quarterly maintenance for the cooling system Maintenance Expected Result Item Method Troubleshooting Monitoring Export smart There are no Rectify the fault or cooling abnormal records in contact Huawei product logs, alarms.
  • Page 237 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Maintenance Expected Result Item Method Troubleshooting Wet film Start the Water drainage is ● If no water is humidifier equipment, normal. supplied, check choose Maint the cable > Diagnostic connection or Mode >...
  • Page 238 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Maintenance Method Expected Result Troubleshooting Item Indicators on Observe the ● If the PWR ● If the PWR the smart ETH PWR, RUN, indicator is steady indicator is off,...
  • Page 239: Semiannual Maintenance

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance 6.1.4 Semiannual Maintenance Table 6-8 Semiannual maintenance for the power supply and distribution system Maintenance Method Expected Result Troubleshooting Item UPS cleanliness Visual inspection The white paper If the white paper...
  • Page 240 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Maintenance Method Expected Result Troubleshooting Item Evaporator Visual inspection The evaporator Use a fin brush to appearance fins are not organize the fins pushed down. that are pushed down.
  • Page 241 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Table 6-10 Semiannual maintenance for the management system Maintenanc Method Expected Result Troubleshooting e Item Availability On the ECC800- The connection If the display is of the smart Pro WebUI,...
  • Page 242 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Maintenanc Method Expected Result Troubleshooting e Item LAN switch Observe the PWR The PWR indicator Take corrective availability indicator on the is steady green. measures based on LAN switch.
  • Page 243 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Maintenanc Method Expected Result Troubleshooting e Item ● Steady green: The LAN switch is not running properly or is starting. ● Steady orange: The indicator is under a self-test during the startup.
  • Page 244: Annual Maintenance

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Maintenanc Method Expected Result Troubleshooting e Item Aisle door Check whether The door can be If the door cannot be availability the door can be opened and closed opened or closed opened and smoothly.
  • Page 245: Alarm Handling

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Maintenance Method Expected Result Troubleshooting Item Battery capacity When the UPS is The test result is 1. Locate the test backed up, Pass. cause when an discharge a exception is battery to the identified.
  • Page 246: Alarm Handling Flowchart

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance 6.2.1 Alarm Handling Flowchart Figure 6-1 Alarm handling flowchart 6.2.2 Viewing and Collecting Alarm Information Prerequisites An alarm is generated. NO TE Alarm information helps to rapidly locate and rectify faults.
  • Page 247: Determining The Faulty Area And Alarm Severity

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Procedure Step 1 Log in to the ECC800-Pro WebUI. Step 2 Click Active Alarms on the home page to view the current alarm information. Step 3 Collect alarm information.
  • Page 248: Locating And Rectifying Faults

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance 6.2.4 Locating and Rectifying Faults Locating Faults Locate faults from the following aspects: ● Component: Locate the component for which the alarm is generated. ● Module: Locate the faulty module after locating a faulty component.
  • Page 249: Parts Replacement

    ● Alarm references in documents delivered with components ● Alarm reference in this document ● Alarm reference obtained from Huawei technical support It is recommended that the alarm handling report consists of information about the alarm occurrence time, location, symptom, fault locating process, alarm handling process, and alarm prevention solutions.
  • Page 250 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance NO TICE ● In ECC800 V100R002C10 and earlier versions, the default IP address for the WAN1 port is 192.168.1.10. ● The WAN1 port IP address cannot be set to an IP address in any of the following network segments: 192.168.0.x, 192.168.245.x, 192.168.246.x and...
  • Page 251 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Figure 6-3 Adding an address Enable file download and set the security level of the trusted site to low. Figure 6-4 Setting parameters Issue 03 (2021-07-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 252 – After the first login, change the password in time to ensure account security and prevent unauthorized network attacks, such as data tampering. Huawei will not be liable for any security issues caused by your failure to change the preset password in time or password loss after changing.
  • Page 253: Parameter Sync

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance 6.3.1.2 Parameter Sync Procedure Step 1 After replacing components, log in to the ECC800-Pro WebUI and choose Maintenance > Parameter Sync to access the parameter synchronization page. Step 2 Click Device type and select the component type from the drop-down list.
  • Page 254: Replacing An Ecc800-Pro Psu

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Step 4 Loosen the screws on both sides of the ECC800-Pro main control module and pull the handles on both sides of the ECC800-Pro main control module to remove the main control module.
  • Page 255: Replacing Ecc800-Pro Antennas

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance ● Tool: insulation gloves ● Material: A spare undamaged and undeformed PSU of the same model is available. Context The PSU is hot-swappable. Procedure Step 1 Push the locking latch in the upper right corner of the PSU panel leftwards.
  • Page 256: Replacing A Sim Card And Microsd Card

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Figure 6-9 Removing antennas Step 2 Install the spare 4G antenna cables and RF_Z antenna cables in the original positions and connect them to the ECC800-Pro. ----End 6.3.2.4 Replacing a SIM Card and MicroSD Card Prerequisites ●...
  • Page 257: Replacing Parts For The Integrated Ups

    Replacement" in the UPS user manual. Table 6-14 Replaceable parts of the integrated UPS Replaceable Part Fuse Indicator Circuit breaker NO TE If you need to replace any other parts, contact Huawei technical support. Issue 03 (2021-07-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 258: Parts Replacement For The Integrated Pdc

    Indicator Power distribution detection module NO TE If you need to replace any other parts, contact Huawei technical support. 6.3.5 Parts Replacement for the Precision PDF For details about parts replacement for the precision PDF, see the "Parts Replacement" section in the corresponding Precision PDC user manual.
  • Page 259: Parts Replacement For The New Main Way

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance 6.3.6 Parts Replacement for the New Main Way For details about parts replacement for new main way, see the "Parts Replacement" section in the new main way quick guide.
  • Page 260: Replacing A Smart Rpdu

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Procedure Step 1 Open the rear door of the cabinet. Step 2 Connect the IT load of the faulty rPDU to a normal rPDU. Step 3 Turn off the upstream power distribution switch for the faulty rPDU. Ensure that the rPDU input has no power, and then remove the power cables from the terminal block on the top of the rPDU.
  • Page 261: Replacing Smart Cooling Product Parts

    Wet film humidifier Control panel Module Electric heater NO TE If you need to replace any other parts, contact Huawei technical support. 6.3.10 Replacing a Smart ETH Gateway Prerequisites ● Tools: ESD wrist strap, ESD gloves, Phillips screwdriver, step ladder, label, marker ●...
  • Page 262: Replacing A Pad

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Procedure Step 1 Label each cable based on the corresponding ports on the smart ETH gateway. Step 2 Disconnect cables from the smart ETH gateway. Step 3 Remove the faulty smart ETH gateway from the guide rails.
  • Page 263: Replacing A Camera

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Procedure Step 1 Open the cabinet door, and disconnect the monitoring cable from the electronic lock. Step 2 Remove the electronic lock. Figure 6-13 Cabinet electronic clasp lock (1) LED indicator...
  • Page 264 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Figure 6-14 Removing the front cover Step 2 Remove the inner cover. Figure 6-15 Removing the inner cover NO TE In the scenario with an SD card, remove the SD card and install it to a new camera.
  • Page 265: Replacing An Ivs1800

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Figure 6-16 Removing a camera base Step 4 Disconnect the camera network cable and remove the dome camera. Step 5 Install a new camera, reconnect the network cable, and secure the camera and base using screws.
  • Page 266: Replacing A Hard Disk For The Ivs1800

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Procedure Step 1 Turn off the power switch of the IVS1800, disconnect the power supply of the IVS1800, remove the cables from the IVS1800, label the cables, and record the original connection positions of the cables.
  • Page 267 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Context Recommended tools and materials: Phillips screwdriver, ESD wrist strap (or ESD gloves). Procedure Step 1 Put on an ESD wrist strap (or ESD gloves) and insert the ground terminal into the ESD jack in the cabinet.
  • Page 268 Figure 6-23 Closing the chassis cover Step 4 Observe the hard disk indicator to check whether the hard disk works properly. ----End Follow-up Procedure If the hard disk works abnormally, contact Huawei technical support. Issue 03 (2021-07-15) Copyright © Huawei Technologies Co., Ltd.
  • Page 269: Replacing An Aisle T/H Sensor

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance 6.3.16 Replacing an Aisle T/H Sensor Prerequisites ● Recommended tools: Phillips screwdriver, flat-head screwdriver ● A T/H sensor needs to be replaced. ● A spare T/H sensor of the same model is available and functional.
  • Page 270 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Figure 6-24 Removing a T/H sensor NO TE Before installing the new T/H sensor, check that its DIP switch settings are consistent with the DIP switch settings of the old T/H sensor.
  • Page 271: Replacing A Temperature Sensor

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Figure 6-25 Installing a T/H sensor Step 5 Choose Monitoring > System > ECC800-Pro > Controls and delete the device failing in communication. Step 6 Choose Monitoring > Aisle > T/H Sensor Group and check whether the T/H sensor works properly.
  • Page 272 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Figure 6-26 Removing a temperature sensor Step 2 Install the spare temperature sensor, bind it to the original position using cable ties, and connect cables to it. NO TICE ●...
  • Page 273: Replacing A Remote T/H Sensor (33010516)

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance 6.3.18 Replacing a Remote T/H Sensor (33010516) Prerequisites ● A T/H sensor needs to be replaced. ● A spare T/H sensor of the same model is available and functional.
  • Page 274: Replacing A Water Sensor

    FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Procedure Step 1 Remove the faulty smoke detector from the top of the PDF. Step 2 Remove the cables from the smoke detector and apply insulation measures such as wrapping the cables with insulation tape to avoid hazards.
  • Page 275 FusionModule2000-S Smart Modular Data Center User Manual 6 Operation and Maintenance Figure 6-27 Connecting a conversion cable to a water detector Step 2 Replace a water detection cable. Remove the faulty water detection cable from the port. Connect a new water detection cable.
  • Page 276: Appendix

    FusionModule2000-S Smart Modular Data Center User Manual 7 Appendix Appendix 7.1 Installing an Expansion Bolt 7.2 Preparing Monitoring Cables 7.3 Preparing Load Cables 7.4 Common Screw Torques 7.5 Installation Verification 7.6 Acronyms and Abbreviations 7.1 Installing an Expansion Bolt Preparations...
  • Page 277 FusionModule2000-S Smart Modular Data Center User Manual 7 Appendix Figure 7-1 Components of an expansion bolt (1) M12 bolt (2) Spring washer (3) Flat washer (4) Expansion sleeve Figure 7-2 Drilling a hole and installing an expansion bolt (unit: mm)
  • Page 278: Preparing Monitoring Cables

    FusionModule2000-S Smart Modular Data Center User Manual 7 Appendix 7.2 Preparing Monitoring Cables Prerequisites ● A network cable, cord end terminals, and RJ45 connectors are prepared. ● The following tools are prepared: – Wire stripper – Crimping tool – RJ45 crimping tool –...
  • Page 279: Preparing Load Cables

    FusionModule2000-S Smart Modular Data Center User Manual 7 Appendix Figure 7-4 Preparing an RS485 monitoring cable for the ECC collector Preparing a Dry Contact Monitoring Cable The method for preparing a dry contact monitoring cable is similar to the method for preparing an RS485 monitoring cable.
  • Page 280 FusionModule2000-S Smart Modular Data Center User Manual 7 Appendix Crimp a cord end terminal. Figure 7-6 Crimping a cord end terminal (1) Cord end terminal (2) Cable (3) Crimping tool (Optional) For a three-core cable with a cross-sectional area of 6 mm...
  • Page 281: Common Screw Torques

    FusionModule2000-S Smart Modular Data Center User Manual 7 Appendix Figure 7-8 Installing cables at a round connector ----End 7.4 Common Screw Torques Application Scenario Screw Specifications Torque (Kgf·cm) (Tolerance: ±10%) Board, module, or M2.5 captive screw 2.1–2.5 panel installation M3 captive screw 3.8–4.2...
  • Page 282 FusionModule2000-S Smart Modular Data Center User Manual 7 Appendix Application Scenario Screw Specifications Torque (Kgf·cm) (Tolerance: ±10%) Cabinet or chassis ST3.5 tapping screw + installation, cable plastic expansion sleeve tray, upper fastener, or antiseismic enhancement Cross recessed pan head installation, cabinet...
  • Page 283: Installation Verification

    FusionModule2000-S Smart Modular Data Center User Manual 7 Appendix Application Scenario Screw Specifications Torque (Kgf·cm) (Tolerance: ±10%) 25–30 32–37 7.5 Installation Verification Cabinet Installation Checklist Check Item Check Result The cabinets are placed according to the □ Passed □ Failed equipment room layout diagram.
  • Page 284 FusionModule2000-S Smart Modular Data Center User Manual 7 Appendix Check Item Check Result There is no foreign matter such as adhesive tape, □ Passed □ Failed cable ties, paper, or packing materials left in and around the aisle. Cable Installation Checklist...
  • Page 285: Acronyms And Abbreviations

    FusionModule2000-S Smart Modular Data Center User Manual 7 Appendix Check Item Check Result Power cables and ground cables are not coiled □ Passed □ Failed and excess parts are cut off. Lugs for power cables and ground cables are □ Passed □ Failed welded or crimped securely.
  • Page 286 FusionModule2000-S Smart Modular Data Center User Manual 7 Appendix energy control center EPDM ethylene-propylene-diene monomer expandable polyethylene Ethernet fast Ethernet integrated circuit internet technology negative temperature coefficient power distribution frame power distribution unit protective earthing power over Ethernet PP-R polypropylene random...