Prerequisites
One end of the straight-through cable has been connected to the COM port on
the PDU2000 and the other end has been connected to the COM port on the ETH
converter.
Context
Table 5-14 PDU2000 basic Information
Vendor
Clever
HPXIN
a: The barcode starts with 21 and is attached to the device.
Procedure
Step 1 Set the PDU2000 monitoring parameters.
Issue 04 (2021-10-09)
Set the PDU2000-M (C) monitoring parameters.
NO TE
The display of a single-phase module is used as an example.
After the PDU2000-M (C) is powered on, the LCM displays the
initialization screen.
Figure 5-10 PDU2000-M (C) initialization screen
Press MENU to enter the device communications address screen.
Figure 5-11 PDU2000-M (C) communications settings
Copyright © Huawei Technologies Co., Ltd.
Name Displayed on the
WebUI
PDU2000-M(C)
PDU2000-M(H)
5 Power-On Commissioning
Eleventh and Twelfth
Characters in Device
Barcode
a
FT
6B
121