Step 3 Press the BLINK button on a device such as a smart ETH gateway for less than 1s
to report the blinking status to the ECC800-Pro. The corresponding device icon in
the WebUI plan view blinks. Check that the device positions and types in the plan
view are consistent with the actual situation by delivering the blinking command.
Figure 8-6 Example plan view without room monitoring
Figure 8-7 Example plan view with room monitoring
----End
Follow-up Procedure
To modify the smart module plan view, perform the following steps:
1.
2.
3.
4.
Issue 04 (2021-10-09)
NO TE
● If a room-level access control device and camera exist, drag them to the equipment
room view.
● You can click the camera icon in the view to display the camera web page.
Choose Home > Plan View.
Click Modify Device in Smart Module View. The Devices is displayed.
Drag registered devices (for example, the camera) to the appropriate
positions in the layout diagram and click Exit Edit Mode. The smart module
plan view is updated.
When editing the smart module view, click
the size of the view.
Copyright © Huawei Technologies Co., Ltd.
Zoom In or
Restore to adjust
8 FAQ
302

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecc800

Table of Contents