ECC800 Data Center Controller
User Manual
Step 5 (Optional) Click Add, set IT Cabinet, select a UIM and the devices connected to
each COM port of the UIM20A, and click
manually bind the devices.
Step 6 Click Submit.
Step 7 Hold down the BLINK button on the UIM for less than 2s. The RUN indicator on
the UIM blinks fast, and the dialog box for binding IT cabinets and devices shows
the UIM that is blinking.
Figure 6-2 Device blinking
Step 8 (Optional) Click
connected to the COM ports of the UIM20A, and click
column.
Step 9 (Optional) Click
Step 10 Choose Home > Plan View on the ECC800-Pro WebUI, and drag the dry contact
device to the corresponding position in the Smart Module View pane based on
the actual device layout.
----End
Issue 04 (2021-10-09)
Connected
-
Device
NO TE
If the automatic cabinet binding result is inconsistent with the actual connection or the
automatic cabinet binding function cannot be used, you need to manually bind devices.
NO TE
You can determine the IT cabinet that houses the UIM through indicator blinking. Then, you
can change the IT cabinet name.
, change the IT cabinet name, change the UIM and the devices
to delete a device binding relationship.
NO TE
Hold down the BLINK button on the UIM for less than 2s. The RUN indicator on the UIM
blinks fast, and the cabinet corresponding to the UIM blinks in the smart module view.
Copyright © Huawei Technologies Co., Ltd.
-
-
in the Operation column to
6 Feature Description
-
in the Operation
132

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecc800

Table of Contents