3.
(4) Set other parameters based on the site requirements by referring to the
preceding steps.
Table 6-36 Parameter description
Module
Name
IMGU
MU
Step 7 (Optional) Configure the IVS1800 to synchronize time with the NTP server. Choose
Local Configuration > Server configuration and configure the server time
information.
Issue 04 (2021-10-09)
Click Edit in the row where the value of Parameter Name is SDKNatIP and
set Value to the NAT-mapped IP address configured on the firewall. Click
Save.
Click Edit in the row where the value of Parameter Name is SDKNatPort and
set Value to the NAT mapped port number configured on the firewall. Click
Save.
Parameter
Name
IMGUNNatIP
IMGUNNatPo
rt
MUNNatIP
NatRtspServer
Port
NatRtspTlsSer
verPort
Copyright © Huawei Technologies Co., Ltd.
Setting
Northbound IP address of the IVS1800, which
must be the same as the NAT-mapped IP
address configured on the firewall.
NAT port number of the IVS1800 IMGU, which
must be the same as the NAT-mapped port
number configured on the firewall.
The default port number of the IMGU before
mapping is 9554.
Northbound IP address of the IVS1800, which
must be the same as the NAT-mapped IP
address configured on the firewall.
NAT port number of the IVS1800 MU, which
must be the same as the NAT mapped port
number configured on the firewall.
The default port number of the MU before
mapping is 554.
TLS NAT port number of the IVS1800 MU,
which must be the same as the NAT mapped
port number configured on the firewall.
The default TLS port number of the MU before
mapping is 322.