Assembling the Cutting Deck Lift Assembly
Groundsmaster 360
16225SL Rev C
g037450
1.
Adjustment clevis
2.
Flange nut (8 each)
3.
Clevis pin
g033702
1. Check the bearing caps (item 13 in
in
Figure
289) for wear or damage. Replace the components if necessary.
2. Install the lift arm components as shown in
A. If the ball joints were removed from the link assembly (item 23 in
289), install the ball joints equally on both ends of the link. Adjust the
center-to-center length of the link assembly
cm (18.070 to 18.180 inches). Tighten the jam nuts to secure the ball
joints to the link. Ensure that the ball joints stay in-line when you tighten
the jam nuts.
Note: Do not change the length of the link assembly to adjust the
height-of-cut or for any other reason.
Note: When properly installed, the flange nuts (item 19 in
should have the flange surface against the lift arm and not against the
chain. Correct assembly will allow chain to free to pivot.
B. If the bolt (item 20 in
insert the bolt into the upper link of the chain and thread the flange nut
onto the bolt with the flange away from the link; torque the flange nut to
68 N∙m (50 ft-lb). When you fasten the chain to the front lift arm, torque
Figure 291
4.
Cotter pin
5.
Cutting deck
6.
HOC chain
Figure 292
Figure
289) and flange bushings (item 26
Figure
289) was removed from the HOC chain,
Page 6–51
Figure 289
and
Figure
(Figure
292) to 45.9 to 46.1