Required Service Materials - Suzuki RA410 Manual

Table of Contents

Advertisement

6B-14 ENGINE COOLING
MATERIALS
Ethylene glycol base coolant
(Anti-freeze/Anti-corrosion coolant)
2) Install water pump to cylinder block and tighten to specified
(a)
3) Connect oil pressure switch coupler and install clamp with its
(a)
4) Install A/C compressor (1) to its bracket.
5) Tighten exhaust manifold bolts/nuts to specified torque.
6) Install water pump belt (refer to WATER PUMP BELT INSTAL-
7) Install A/C compressor belt (if equipped).
8) Fill coolant.
9) Install front bumper.
10) Connect negative cable at battery.
11) Check each part for leakage.
REQUIRED SERVICE MATERIAL
torque.
Tightening Torque
(a): 22 N·m (2.2 kg-m, 16.0 lb-ft)
harness.
LATION).
Additive to engine cooling system for improving cooling effi-
ciency and for protection against rusting.
USE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents