6A4-22 ENGINE MECHANICAL
1
INSTALLATION
1) Install new gasket (1) to cylinder head.
2) Install exhaust manifold.
3) Install pipe gasket and install exhaust pipe to exhaust manifold.
4) Install exhaust manifold cover (1).
2
5) Connect heated oxygen sensor coupler (2) and clamp its wire
6) Install front bumper (refer to Section 9).
7) Connect negative cable at battery.
8) Check exhaust system for exhaust gas leakage.
Tighten bolts and nuts to specified torque.
Tightening Torque
.
(a): 23 N
m (2.3 kg-m, 17.0 lb-ft)
Before installing pipe gasket, check it for deterioration or dam-
age, and replace as necessary.
Tighten pipe fasteners to specified torque.
Tightening Torque
.
(a): 50 N
m (5.0 kg-m, 36.5 lb-ft)
securely.