FusionModule2000 Smart Modular Data Center
Installation Guide
----End
15.5 Installing Monitoring Devices on Cable Troughs
15.5.1 Layout of Smart ETH Gateways (Dual-Row Scenario)
Table 15-4 Scenario 1
Scenario
Figure 15-64 Layout of smart ETH gateways in scenario 1
Table 15-5 Scenario 2
Scenario
Issue 02 (2018-03-31)
Components marked in the same background color should be connected to the same smart ETH
gateway.
Rack environment unit not deployed
Module length ≤ 7 m; number of air
conditioners ≤ 4
Rack environment unit not deployed
Module length > 7 m; number of air
conditioners > 4
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
15 Installing Monitoring Devices
Rules for Deploying Smart ETH
Gateways
Deploy one smart ETH gateway for each
end cabinet in the smart module, not for
other cabinets. A total of four smart ETH
gateways should be deployed, as shown in
Figure
15-64.
Rules for Deploying Smart ETH
Gateways
Deploy one smart ETH gateway for each
end cabinet and IT cabinet in the middle in
the smart module, not for other cabinets. A
total of six smart ETH gateways should be
deployed, as shown in
Figure
15-65.
225