FusionModule2000 Smart Modular Data Center
Installation Guide
Follow-up Procedure
Before connecting the power plug of a device to the rPDU, loosen the locking device on the
rPDU. After connecting the power plug, tighten the locking device.

6.5 (Optional) Adjusting Battery Cabinet Side Plates

If an auxiliary battery cabinet (no circuit breaker) is deployed in the smart module, remove
the plate on one side of the main battery cabinet and install the side plate on the outer side of
the auxiliary cabinet based on the label on the main battery cabinet. Ensure that there are side
plates on the outer sides of the main and auxiliary battery cabinets and there is no side plate
between the adjacent battery cabinets.

6.6 (Optional) Installing a Battery Cabinet Top Frame

The top frame of a battery cabinet is installed in the same way as the top frame of a PDC. For
details, see section "Installing a Top Frame" under "Installing the PDC."

6.7 (Optional) Installing a Horizontal Ground Bar

Context
Install one horizontal ground bar with a BOM number of 21170398 inside the battery cabinet
or IT cabinet closest to the PDC for each row of cabinets.
Preparations
Tools: adjustable wrench, torque wrench
Material: horizontal ground bar
Procedure
Step 1 Remove the two M8 screws from the horizontal ground bar.
Issue 02 (2018-03-31)
After adjusting the side plate of the battery cabinet, remove the label which indicates side plate
adjustment from the main battery cabinet.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 Installing the Network Cabinet, IT Cabinet, and Battery
Cabinet
63

Advertisement

Table of Contents
loading

Table of Contents