15.1.1 (Optional) Installing an RH2288 Server

Preparations
Tool: Phillips screwdriver
Materials: RH2288 server, guide rail, rubber plug
Document: installation position diagram for monitoring devices in the network cabinet
Procedure
Step 1 Install guide rails.