Huawei FusionModule2000 Installation Manual page 26

Smart modular data center
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide
Tool Appearance, Specifications, and Name
Oxygen
Pipe bender
Vacuum pump
Reducing valve
a: For equipment with humidifiers, ensure that the water pipe thread sealant is able to resist
temperatures higher than 85° C and the following requirements are met:
Issue 02 (2018-03-31)
Acetylene
Pipe expander
c
Thermocouple
temperature sensor
e
N/A
N/A
Applicable to all pipe materials.
Anaerobic metal pipe thread sealant with PTEF as the padding.
Glycol solution resistant, fit for threads and pipes.
Maximum gap: 0.5 mm.
Pressure resistance: above 3 MPa.
Compliant with the industry standard JB/T7311-2008 Technical Specification for the
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2 Installation Preparations
Hot melt device (for
rigid water pipes)
Pressure gauge (2
b
PCS)
Antifreeze gloves
N/A
N/A
d
Nitrogen
Leather hose (5
b
PCS)
Electronic scale
N/A
N/A
17