Figure 10-23 Assembling a door frame
Secure the left and right posts to the upper frame mounting kit using six M6x16 screws,
as shown by (3) in
Figure
To facilitate assembly, lay the posts and upper frame mounting kit on the floor.
After the assembly is complete, verify that the posts are flush with the upper frame mounting kit.
Stand the door frame, and partially secure (do not fully tighten the fasteners) left and
right posts to the skylight connective plates using four M6x16 screws, flat washers, and
nuts, as shown by (1) in
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
10-23.