Optional) Installing Top Frames (Bottom Pipe Routing) - Huawei FusionModule2000 Installation Manual

Smart modular data center
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide

7.1.2 (Optional) Installing Top Frames (Bottom Pipe Routing)

Prerequisites
If the IT cabinet is 1200 mm deep, install top frames after installing air conditioner enclosure
frames.
Preparations
Tool: Phillips screwdriver
Material: top frame
Procedure
Step 1 Remove the two M5x10 tapping screws that secure the front door sealing plate on the top of
the cabinet, as shown by (1) in
Step 2 Place the top frame and ensure that the side with FRONT faces upwards toward the cabinet
front door, as shown by (2) in
Step 3 Secure the top frame.
1.
2.
Figure 7-3 Installing a top frame
----End
Issue 02 (2018-03-31)
Use four M8x20 screw assemblies to secure the top frame to the cabinet, as shown by (3)
and (4) in
Figure
7-3.
Install two M5x10 tapping screws at the front of the top frame to set up equipotential
bonding between the cabinet and the top frame, as shown by (3) in
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
7-3.
Figure
7-3.
7 Installing Air Conditioners
Figure
7-3.
71