FusionModule2000 Smart Modular Data Center
Installation Guide
2.
3.
Step 5 Install the antenna.
1.
2.
Issue 02 (2018-03-31)
Figure 15-13 Removing an ECC800 main control module
Install the SIM card in the correct slot on the left side of the ECC800 main control
module.
Figure 15-14 Installing a SIM card
Reinstall the ECC800 main control module in the ECC800 subrack, and tighten the
captive screws on both sides of the module.
The antenna can be installed using the magnet on its base. Attach the 2.4G antenna
(RF_Z antenna) to the skylight connective plate above the top of the network cabinet in
the aisle containment. (Optional) Attach the 3G antenna to the skylight connective plate
or the network cabinet top plate outside the aisle containment.
Route the 2.4G antenna cable through the cable hole in the skylight plate, through the
rodent-proof mesh and sponge strip on the top of the cabinet, and to the correct port on
the ECC800. (Optional) Route the 3G antenna cable through the rodent-proof mesh and
sponge strip on the top of the cabinet and to the correct port on the ECC800.