FusionModule2000 Smart Modular Data Center
Installation Guide
Issue 02 (2018-03-31)
Figure 17-15 Installing a separator
Figure 17-16 Attaching the battery label
Route and secure cables between layers along the rack rail in the vertical direction, as
shown by (1) in
Figure
17-17.
Route and secure cables between layers along the tray supporting beam in the horizontal
direction, as shown by (2) in
Figure 17-17 Cable routes
(Optional) When battery cabinets are installed adjacent to each other, remove the upper
side plates from the battery cabinets for routing cables to the corresponding ports.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
17-17.
17 Connecting Cables
280