Figure 15-80 Laying out a water detection cable (bottom pipe routing)
(1) ECC800
Do not contact the water detection cable to metal, for this action will cause a false alarm. Take
protective measures when routing a water detection cable.

15.9.3 Connecting a Cable to the WLDS900 Water Sensor

Context
Issue 02 (2018-03-31)
(2) Network cable
The water sensor is composed of the water detection cable (BOM number: 33010445),
water detector (BOM number: 33010352), and conversion cable (packed with the water
detector).
When the air conditioner pipes are routed from the top, the water detector is installed in
the network cabinet and its opposite cabinet, and bound to the rack rail at the rear door
using cable ties. The binding position is 5 U away from the cabinet bottom.
When the air conditioner pipes are routed from the bottom, the water detector is installed
in the network cabinet, and bound to the rack rail at the rear door using cable ties. The
binding position is 5 U away from the cabinet bottom.
A single water detection cable is 5 meters long. If a longer cable is required, connect
multiple water detection cables to increase the length. One water detector can connect to
a maximum of nine water detection cables.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
15 Installing Monitoring Devices
(3) Water detector
(4) Water detection cable