1. Slightly loosen the M4x12 screws securing the hanging kits to the conversion brackets (do
2. Adjust the gaps between adjacent door boxes, as shown by (2) in
3. Tighten the screws to secure the hanging kits to the conversion brackets, as shown by (3)
----End
Follow-up Procedure
Issue 02 (2018-03-31)
not remove the screws), as shown by (1) in
is larger at the top and smaller at the bottom, adjust the outer M6 screws downwards to
ensure that the door boxes are in close contact, as shown by A in
is smaller at the top and larger at the bottom, adjust the inner M6 screws downwards to
ensure that the door boxes are in close contact, as shown by B in
in
Figure
10-29.
Figure 10-29 Adjusting the gaps between door boxes
Adjust the inner rubber strip to ensure that the two glass doors are in close contact.
If the two glass doors do not align well because the end cabinets are not properly placed,
insert a spacer between the post and fixing position of the backward cabinet, as shown in
Figure
10-30.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
10 Installing the Aisle Containment
Figure
10-29.
Figure
Figure
Figure
10-29. If the gap
10-29. If the gap
10-29.
120

Advertisement

Table of Contents
loading

Table of Contents