Optional) Connecting Cables To Industrial Connectors - Huawei FusionModule2000 Installation Manual

Smart modular data center
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide
Installing Panels
1.
2.
Figure 17-23 Installing filler panels

17.8.3 (Optional) Connecting Cables to Industrial Connectors

Figure 17-24
connector cable connections depend on the industrial connector type and wiring port silk
screen.
Figure 17-24 Connecting cables to the industrial connector (three-core cable)
Issue 02 (2018-03-31)
Reinstall the circuit breaker panel.
Secure filler panels to the rack rails on the rear door, as shown in
Each filler panel occupies 2 U. Install them according to the U position markings on the cabinet. Ensure
that filler panels fully cover the rack rails.
to
Figure 17-25
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
show only the cable connection methods. The industrial
17 Connecting Cables
Figure
17-23.
284

Advertisement

Table of Contents
loading

Table of Contents