Installing Bases With Fixed Dimensions - Huawei FusionModule2000 Installation Manual

Smart modular data center
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide
Step 3 Secure the adjustable feet using the four M6 screws removed before.
Figure 4-15 Securing adjustable feet
----End

4.3.3 Installing Bases with Fixed Dimensions

Prerequisites
Adjustable feet of bases have been adjusted.
Preparations
Tools: marker, socket wrench, torque wrench, hammer drill, φ16 drill bit, level
Materials: base, expansion bolt, washer
Document: base installation position diagram
Issue 02 (2018-03-31)
Move the adjustable feet of the air conditioner base to the cabinet front (close to the front
door of the cabinet).
Move the adjustable feet of the PDC base to the cabinet rear (close to the rear door of the
cabinet).
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 (Optional) Installing Bases
50

Advertisement

Table of Contents
loading

Table of Contents