Figure 15-53 Assembling a pad power connector holder (BOM number: 14190892)
Figure 15-54 Assembling a pad power connector holder (BOM number: 14190242)
Step 2 Connect cables from the power connector to the AC actuator, and route the cables.
Issue 02 (2018-03-31)
Install the holder cover using two M4x12 screw assemblies.
Install the holder baffle plate using one M4x12 screw assembly.