11.1.4 Installing End Panels for Cable Troughs

Context
Preparations
Material: cable trough end panel
Procedure
Step 1 Hold the top of the end panel with both hands to keep it vertical. Press it from up to down into
the hooks at the end of the cable troughs until the top of the end panel aligns with the top of
the cable trough.
Issue 02 (2018-03-31)
Typically, end panels are installed only on cable troughs of cabinets at the two ends of an
aisle.
A red end panel indicates that the corresponding cable trough is for power cables, and a
blue end panel for signal cables.
Generally, the power cable trough is located close to the aisle containment, and the signal
cable trough is located far away from the aisle containment.
Obtain the cable trough end panels from the end door materials.
During installation, the interconnecting lever is vertical.