Step 1 Remove the two M5x10 tapping screws that secure the front door sealing plate on the top of
the cabinet, as shown by (1) in
Figure 7-14 Placing a top frame
Step 2 Remove the rear decorative plate from the top frame, and then remove the four M5x10
tapping screws and the six M4x10 countersunk screws from the rear plate of the top frame, as
shown by (2) and (3) in
Step 3 Place the top frame and ensure that the side with FRONT faces upwards toward the cabinet
front door, as shown by (4) in
Step 4 Secure the top frame.
1.
Issue 02 (2018-03-31)
Figure
Use the four M5x10 tapping screws and the six M4x10 countersunk screws to secure the
rear plate to the top frame, and clamp the rear decorative plate, as shown by (1) and (2)
in
Figure
7-15.
Figure 7-15 Securing a top frame
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
7-14.
7-14. Then remove the rear plate.
Figure
7-14.
7 Installing Air Conditioners