FusionModule2000 Smart Modular Data Center
Installation Guide
Figure 3-12 Column occupying part of a cabinet place (A ≥ 800 mm and B ≥ 400 mm)
Issue 02 (2018-03-31)
Cabinet places on the column side are left blank and sealed by sealing plates. Directions of the
concave sides of the sealing plates are shown in
Install cable trays over the cabinets on both sides of the blank cabinet places. If the cable trays
cannot be installed in combined mode, install them in layered mode, the upper for routing
weak-current cables while the lower for routing strong-current cables.
Install an adjustable skylight over the aisle containment. The area to be covered by the adjustable
skylight is shown in
Figure
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
3-12.
3 Smart Module Layout Requirements