Huawei FusionModule2000 Installation Manual page 291

Smart modular data center
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide
Connecting Cables to the Circuit Breaker in a Battery Cabinet
Before connecting cables, ensure that the circuit breaker is OFF.
Connect cables to the circuit breaker as follows:
1.
2.
3.
4.
5.
Issue 02 (2018-03-31)
Figure 17-20 Incorrect battery cable connection method
(Optional) If the intelligent battery monitoring system is deployed, knock off the cover
on the CIM indicator hole on the circuit breaker panel, as shown by (1) in
Remove the circuit breaker panel, as shown by (2) in
Connect the battery cables +, N, and -, as shown by (3) in
Connect the UPS cables +, N, and -, as shown by (4) in
(Optional) If two battery strings are deployed, connect the UPS terminals +, N, and - for
one battery string to the UPS terminals +, N, and - for the other battery string.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
17 Connecting Cables
Figure
Figure
17-21.
Figure
17-21.
Figure
17-21.
17-21.
282

Advertisement

Table of Contents
loading

Table of Contents